NAES
5 MW storage in Burlington, NJ · In queue since September 2020 · Proposed COD June 2027
5 MW
Capacity
1
Components
Battery
6y 2m
In Queue
IA Executed
IA Phase
Signed Oct 2021
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Queue → IA
1y 1m
IA → COD
5y 8m
Total Duration
1y 1m
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Construction pending
Typical: 6–18 months
Proposed COD: 2027-06-30
About
Generated Oct 25, 2026
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
NAES is a proposed 5 MW battery energy storage project located in Burlington County, New Jersey. The standalone storage facility is planned to interconnect with the transmission system of PSEG at the Burlington 26 kV point of interconnection. The project's developer is not identified in the available queue data.
The project is listed in the PJM Interconnection queue under the identifier PJM-AG1-130, having entered the queue on September 1, 2020. It has requested Network Resource Interconnection Service (NRIS). An interconnection agreement for the project was executed on October 28, 2021, and its proposed commercial operation date is June 30, 2027. The project's current queue status is listed as suspended.
Summary provenance
Summary generated Oct 25, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- PJM queue source as of: Oct 25, 2026.
Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
NJ
County
Burlington
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
PSEG
Entity
PJM
Service Type
NRIS
Point of Interconnection
Burlington 26 kV
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- PJM
- Trading Hub
- WESTERN HUB
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- BURLING2138 KV T1
- POI Substation
- Burlington Heights Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
AES Baird Solar CSG
Data-driven briefing on AES — fleet, generation, financial, and news signals.
AES ES GILBERT
Data-driven briefing on AES — fleet, generation, financial, and news signals.
AES Petersburg
Data-driven briefing on AES — fleet, generation, financial, and news signals.
NAES
Data-driven briefing on NAES — fleet, generation, financial, and news signals.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.