CPV Backbone Solar
175 MW generation in Garrett, MD · In queue since March 2020 · Proposed COD November 2026
175 MW
Capacity
1
Components
Solar
6y 8m
In Queue
IA Executed
IA Phase
COD target: 2026
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
6y 8m
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Partially in Service - Under Construction
Project under construction
Typical: 12–24 months
Proposed COD: 2026-11-30
From dated articles. These observations may describe earlier stages or other project phases; see the queue record above for reported filing status.
Cross-source intelligence
Experimental assessment saved at the research date. Predates the Oct 25, 2026 queue source. Research and queue COD differ; this comparison does not confirm either date. See the queue record for reported project facts.
Milestones in this assessment
CPV Backbone Solar commissioned and operational at 160-175 MW capacity
pv-tech.orgResearch sources and reasoning (2 recorded sources)
high confidence at research time
- thomasnet.com/insights/cpv-renewable-power-maryland-solar-farm/
- pv-tech.org/cpv-renewable-commissions-160mw-solar-plant-maryland/
Commercial operation date: LBNL proposed COD was 2026-03-15, but PV Tech (Dec 2025) and Thomasnet (Jan 2026) both report the project as operational/commissioned in late 2025, indicating the project came online ~3 months earlier than LBNL forecast.
Developer: LBNL snapshot has null developer field. News sources consistently identify CPV Renewable Power (a subsidiary of Competitive Power Ventures) as the developer and operator.
Status: Multiple news sources from Dec 2025-Jan 2026 confirm the project has achieved commercial operation. LBNL status shows 'active' with IA Executed, but is_operational=false is now stale.
About
Generated Apr 10, 2026 · Predates Oct 25, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The CPV Backbone Solar project is a proposed 175 MW solar generation facility in Garrett County, Maryland. The project, developed under the PJM Interconnection queue as project PJM-AF2-356, entered the queue on March 31, 2020, with a proposed commercial operation date of March 15, 2026. The interconnection agreement (IA) for the project has been executed. The point of interconnection is the Albright-Mt. Zion 138 kV line.
The proposed project is linked to an existing operating plant, CPV Backbone Solar (EIA ID 67022). Recent news coverage, including articles related to industry, grid, and development, has featured the project.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- PJM queue source as of: Oct 25, 2026.
Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
MD
County
Garrett
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
APS
Entity
PJM
Service Type
NRIS
Point of Interconnection
Albright-Mt. Zion 138 kV
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- PJM
- Trading Hub
- WESTERN HUB
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- KITZMILR34.5 KV BACKBNSP
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Last updated 2026-03-26