SBC Solar
10 MW hybrid in Dorchester, MD · In queue since March 2020 · Proposed COD December 2027
10 MW
Capacity
1
Components
Solar
6y 4m
In Queue
IA Executed
IA Phase
COD target: 2027
Total Duration
7y 9m
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Project under construction
Typical: 18–30 months
Proposed COD: 2027-12-31
The SBC Solar project is a proposed 10 MW hybrid solar and battery energy storage project located in Dorchester County, Maryland. The project, consisting of 10 MW of solar generation, is in the PJM interconnection queue as entry PJM-AF2-325. The queue entry date is March 30, 2020, and the proposed commercial operation date is December 31, 2027. The project's interconnection status is currently in the System Impact Study phase.
The proposed project is located within the Delmarva Power & Light (DPL) service area and interconnects at the Jacktown 12 kV point of interconnection. The project is listed as active within the PJM queue. The developer is not specified in the provided data.
Generated from interconnection queue and public data sources
Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
MD
County
Dorchester
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
DPL
Entity
PJM
Service Type
NRIS
Point of Interconnection
Jacktown 12 kV
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- PJM
- Trading Hub
- WESTERN HUB
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- CAMBRIDG69 KV CAMBRISP
- POI Substation
- Jacktown Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No Ask reports yet for this entity.
Ask about SBC SolarForward forecasts, scenario decomposition, and risk-decision tooling for this queue project.