Steward Creek Solar (PJM-AF2-199) — Project Summary

Queue ID
PJM-AF2-199
Capacity
100 MW
Technology
Solar
Status
active
Location
Lee, IL
Region
PJM
Developer
Steward Creek Solar, LLC
IA Status
System Impact Study

Steward Creek Solar

PJM-AF2-199BetaActiveSolarPJMLBNL

100 MW generation in Lee, IL · In queue since March 2020 · Proposed COD November 2023

BA: PJMISO/RTO: PJMNERC: RFCRC: MISO

100 MW

Capacity

1

Components

Solar

6y 4m

In Queue

System Impact Study

IA Phase

COD target: 2023

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

3y 8m

Schedule

33 months past proposed COD

Study Phase

TC1

Impact Study25%
Queue EntryMar 24, 2020

Interconnection request submitted to ISO/RTO

System Impact StudyCurrent

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2023-11-01

Cross-source intelligence
Beta
Low confidence·0 sources·as of 2026-06-01
Expected COD
Nov 2023
From queue filing
Developer
Steward Creek Solar, LLC
From queue filing
Status
Active
Active — queue position maintained but proposed 2023 COD has passed with no construction or operational announcements found
Financing
Unannounced
Key milestones
COD targetNov 2023Most recent

LBNL queue proposed commercial operation date (now past)

About

PJM-AF2-199 is a proposed solar generation project with a total capacity of 100 MW, located in Lee County, Illinois. The project is interconnected within the PJM Interconnection queue, having entered the queue on March 24, 2020. Its proposed commercial operation date is November 1, 2023.

The interconnection status of the project is currently in the System Impact Study phase. The proposed point of interconnection (POI) is the Nelson-Electric Junction 345 kV. The utility is ComEd.

Generated from interconnection queue and public data sources

Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

IL

County

Lee

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

Steward Creek Solar, LLC

Utility

ComEd

Entity

PJM

Service Type

NRIS

Point of Interconnection

Nelson-Electric Junction 345 kV

Data Source

LBNL

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
PJM
Trading Hub
N ILLINOIS HUB
Hub Confidence
MEDIUM

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.

No Ask reports yet for this entity.

Ask about Steward Creek Solar
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.