Mammoth Central Energy Center
300 MW generation in Pulaski, IN · In queue since March 2020 · Proposed COD February 2027
300 MW
Capacity
1
Components
Solar
6y 8m
In Queue
IA Executed
IA Phase
COD target: 2027
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
6y 11m
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Partially in Service - Under Construction
Project under construction
Typical: 12–24 months
Proposed COD: 2027-02-09
From dated articles. These observations may describe earlier stages or other project phases; see the queue record above for reported filing status.
Cross-source intelligence
Experimental assessment saved at the research date. Research and queue COD differ; this comparison does not confirm either date. See the queue record for reported project facts.
Milestones in this assessment
Doral Renewables secured $1.5B debt and tax equity financing to complete Mammoth Solar.
prnewswire.comDoral announced commercialization of the remaining 900 MW of Mammoth Solar, including Mammoth Central I and II.
morningstar.comResearch sources and reasoning (5 recorded sources)
medium confidence at research time
- morningstar.com/news/pr-newswire/20261007ph66442/doral-renewables-celebrates-commercialization-of-the-remaining-900-mw-of-mammoth-solar
- energynews.pro/en/doral-renewables-to-bring-remaining-900-mwac-of-mammoth-solar-into-commercial-operation
- prnewswire.com/news-releases/doral-renewables-secures-1-5-billion-of-debt-and-tax-equity-financing-for-the-completion-of-mammoth-solar-302458555.html
- tipranks.com/news/private-companies/progress-advances-on-900-mw-phase-of-mammoth-solar-project
- power-technology.com/news/novasource-om-services-mammoth-solar-project-indiana/
Commercial operation date: Doral's Oct 7, 2026 PR Newswire release (via Morningstar) says it 'celebrated commercialization of the remaining 900 MW of Mammoth Solar', which includes Mammoth Central I and II. LBNL's 2027-02-09 date is only about 4 months later, so I treat it as roughly consistent, with the real COD at or before late 2026.
Developer: The LBNL developer field is blank, so there is no conflict. News extraction (TipRanks, Power Technology, PR Newswire) and the live press releases consistently name Doral Renewables LLC as developer of the Mammoth Solar complex.
Status: The Oct 7, 2026 Doral release celebrates commercialization of the Mammoth Central phases, and an earlier energynews piece described this as 'imminent'. The LBNL 'active' flag is stale relative to this. The exact phase-to-queue-ID mapping is not confirmed, so confidence is moderate.
About
Generated Apr 10, 2026 · Predates Oct 25, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The proposed Mammoth Central Energy Center is a 300 MW solar generation project located in Pulaski County, Indiana. The project, developed by AEP, is in the PJM interconnection queue as entry PJM-AF2-132, with a queue entry date of March 4, 2020, and a proposed commercial operation date of February 9, 2027. The project's interconnection agreement has been executed.
The Mammoth Central Energy Center is linked to the existing Mammoth Central II Solar Facility (EIA plant ID 68514). The development has been the subject of recent news coverage.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- PJM queue source as of: Oct 25, 2026.
Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
IN
County
Pulaski
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
AEP
Entity
PJM
Service Type
NRIS
Point of Interconnection
Reynolds-Olive #1 345 kV
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- PJM
- Trading Hub
- N ILLINOIS HUB
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Last updated 2026-04-19
View all articlesSolar queue pipeline overview
Summary analysis with parallel narrative sections and visualizations.
Energy Center
Data-driven briefing on Energy Center — fleet, generation, financial, and news signals.
Mammoth Central Energy Center
Data-driven briefing on Mammoth Central Energy Center — fleet, generation, financial, and news signals.
Solar queue pipeline overview
Summary analysis with parallel narrative sections and visualizations.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.