Mammoth Central Energy Center (PJM-AF2-132) — Project Summary

Queue ID
PJM-AF2-132
Capacity
300 MW
Technology
Solar
Status
active
Location
Pulaski, IN
Region
PJM
Developer
—
IA Status
IA Executed

Mammoth Central Energy Center

PJM-AF2-132BetaActiveSolarPJMLBNL + Live

300 MW generation in Pulaski, IN · In queue since March 2020 · Proposed COD February 2027

BA: MISOISO/RTO: PJMNERC: RFCRC: MISO

300 MW

Capacity

1

Components

Solar

6y 8m

In Queue

IA Executed

IA Phase

COD target: 2027

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

6y 11m

Construction75%
Queue EntryMar 4, 2020

Interconnection request submitted to ISO/RTO

System Impact Study

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Partially in Service - Under Construction

Project under construction

Typical: 12–24 months

Commercial Operation

Proposed COD: 2027-02-09

News-reported activity

From dated articles. These observations may describe earlier stages or other project phases; see the queue record above for reported filing status.

Latest milestoneone-year event · 2025-05-16TipRanks · 2026-04-03

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. Research and queue COD differ; this comparison does not confirm either date. See the queue record for reported project facts.

Research COD
2026
Differs from queue: Feb 9, 2027
Developer in saved assessment
Doral Renewables
Sources agreed at research time
Status at research time
Online
LBNL shows Active with IA Executed. Doral announced commercial operation of the remaining 900 MW of Mammoth Solar (South, Central I, Central II) in Oct 2026. The mapping of AF2-132 to a specific phase is inferred from the three 300 MW entries.
Financing
Secured
$1.5B of debt and tax equity closed for completion of Mammoth Solar. Lenders: KeyBanc Capital Markets, Banco Santander, HSBC Bank USA, Truist Bank. Announced 2025-05-19.

Milestones in this assessment

Financing closeMay 19, 2025

Doral Renewables secured $1.5B debt and tax equity financing to complete Mammoth Solar.

prnewswire.com
COD targetOct 7, 2026Latest in this assessment

Doral announced commercialization of the remaining 900 MW of Mammoth Solar, including Mammoth Central I and II.

morningstar.com
Research sources and reasoning (5 recorded sources)

medium confidence at research time

  1. morningstar.com/news/pr-newswire/20261007ph66442/doral-renewables-celebrates-commercialization-of-the-remaining-900-mw-of-mammoth-solar
  2. energynews.pro/en/doral-renewables-to-bring-remaining-900-mwac-of-mammoth-solar-into-commercial-operation
  3. prnewswire.com/news-releases/doral-renewables-secures-1-5-billion-of-debt-and-tax-equity-financing-for-the-completion-of-mammoth-solar-302458555.html
  4. tipranks.com/news/private-companies/progress-advances-on-900-mw-phase-of-mammoth-solar-project
  5. power-technology.com/news/novasource-om-services-mammoth-solar-project-indiana/

Commercial operation date: Doral's Oct 7, 2026 PR Newswire release (via Morningstar) says it 'celebrated commercialization of the remaining 900 MW of Mammoth Solar', which includes Mammoth Central I and II. LBNL's 2027-02-09 date is only about 4 months later, so I treat it as roughly consistent, with the real COD at or before late 2026.

Developer: The LBNL developer field is blank, so there is no conflict. News extraction (TipRanks, Power Technology, PR Newswire) and the live press releases consistently name Doral Renewables LLC as developer of the Mammoth Solar complex.

Status: The Oct 7, 2026 Doral release celebrates commercialization of the Mammoth Central phases, and an earlier energynews piece described this as 'imminent'. The LBNL 'active' flag is stale relative to this. The exact phase-to-queue-ID mapping is not confirmed, so confidence is moderate.

Project lifecycle
as of 2025-04-22
PhaseOnlinePower Technology · 2025-04-22
OperationalYesPower Technology · 2025-04-22
TechnologySolarPower Technology · 2025-04-22
DeveloperDoral RenewablesPower Technology · 2025-04-22
COD achievedReportedPower Technology · 2025-04-22

About

Saved background

Generated Apr 10, 2026 · Predates Oct 25, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The proposed Mammoth Central Energy Center is a 300 MW solar generation project located in Pulaski County, Indiana. The project, developed by AEP, is in the PJM interconnection queue as entry PJM-AF2-132, with a queue entry date of March 4, 2020, and a proposed commercial operation date of February 9, 2027. The project's interconnection agreement has been executed.

The Mammoth Central Energy Center is linked to the existing Mammoth Central II Solar Facility (EIA plant ID 68514). The development has been the subject of recent news coverage.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • PJM queue source as of: Oct 25, 2026.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

IN

County

Pulaski

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

—

Utility

AEP

Entity

PJM

Service Type

NRIS

Point of Interconnection

Reynolds-Olive #1 345 kV

Data Source

LBNL + Live

DeveloperDoral Renewables±TipRanks · 2026-04-03
PartnerDoral RenewablesPower Technology · 2025-04-22
EPC contractorBechtel Corporation±TipRanks · 2026-04-03
CompanyNovaSource Power ServicesPower Technology · 2025-04-22
TransactionDebt financingPR Newswire · 2025-05-19
Deal value$1.5BPR Newswire · 2025-05-19
LenderKeyBanc Capital Markets, Inc., Banco Santander, S.A., HSBC Bank USA, N.A., Truist BankPR Newswire · 2025-05-19
Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
PJM
Trading Hub
N ILLINOIS HUB
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

Insights & Articles (4)Beta

Last updated 2026-04-19

View all articles
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.