Dulles Solar and BESS
100 MW generation in Loudoun, VA · In queue since September 2019 · Proposed COD October 2026
100 MW
Capacity
1
Components
Solar
7y 2m
In Queue
IA Executed
IA Phase
COD target: 2026
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
7y 1m
Schedule
1 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Partially in Service - Under Construction
Project under construction
Typical: 12–24 months
Proposed COD: 2026-10-31
From dated articles. These observations may describe earlier stages or other project phases; see the queue record above for reported filing status.
Cross-source intelligence
Experimental assessment saved at the research date. Predates the Oct 25, 2026 queue source. Research and queue COD differ; this comparison does not confirm either date. See the queue record for reported project facts.
Milestones in this assessment
Research sources and reasoning (2 recorded sources)
medium confidence at research time
- wusa9.com/article/tech/science/environment/dulles-airport-solar-project-groundbreaking/65-547b839c-b36b-4999-ae46-a2e593cc1afe
- enr.com/articles/57117-giant-airport-solar-energy-projects-take-off-in-missouri-virginia
Commercial operation date: LBNL lists 2026-10-31 COD, but WUSA9 (2023-08-22) reported groundbreaking with 2024 expected completion. The 2-year gap suggests LBNL data is stale; news reflects developer's active construction timeline.
Developer: News extraction attributes this to 'Evergy' but links to an article about '816 Solar Consortium KCI Solar Farm' in Missouri—a different project. No reliable developer identified for the Dulles Solar and BESS project specifically.
Status: LBNL shows 'active' with IA Executed. WUSA9 and ENR confirm groundbreaking in August 2023 with construction underway as of Q1 2025 milestone reference.
About
Generated Apr 10, 2026 · Predates Oct 25, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
Dulles Solar is a proposed 100 MW solar generation project located in Loudoun County, Virginia. The project is in the PJM interconnection queue as entry PJM-AF1-147, with a queue entry date of September 20, 2019. Dominion is the interconnecting utility. The proposed commercial operation date is October 31, 2026, and the Interconnection Agreement has been executed.
The Dulles Solar project has been the subject of recent news coverage, with nine articles related to its development and the solar industry.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- PJM queue source as of: Oct 25, 2026.
Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
VA
County
Loudoun
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
Dominion
Entity
PJM
Service Type
NRIS
Point of Interconnection
Poland Rd-Runway DP 230kV
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- PJM
- Trading Hub
- DOMINION HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Last updated 2026-03-26
View all articlesForward forecasts, scenario decomposition, and risk-decision tooling for this queue project.