Rogue's Wind
109.9 MW generation in Clearfield, PA · In queue since August 2019 · Proposed COD September 2026
109.9 MW
Capacity
1
Components
Wind
7y 3m
In Queue
IA Executed
IA Phase
COD target: 2026
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
7y 1m
Schedule
3 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Partially in Service - Under Construction
Project under construction
Typical: 18–36 months
Proposed COD: 2026-09-01
From dated articles. These observations may describe earlier stages or other project phases; see the queue record above for reported filing status.
Cross-source intelligence
Experimental assessment saved at the research date. Predates the Oct 25, 2026 queue source. Research and queue COD differ; this comparison does not confirm either date. See the queue record for reported project facts.
Milestones in this assessment
Construction underway at Rock Run ATV Park site with White Construction as EPC
tribdem.comQ2 2025 commercial operation target per developer
tribdem.comResearch sources and reasoning (1 recorded sources)
medium confidence at research time
Commercial operation date: LBNL proposed COD of Sept 2026 is stale. Tribune-Democrat article from July 2025 reports project 'under construction' with Q2 2025 target COD, indicating the project is tracking ~15 months ahead of the queue filing date.
Developer: LBNL snapshot has null developer field. News extraction identifies CPV as developer with project named 'CPV Rogue's Wind'. No shell LLC vs parent distinction evident.
Status: LBNL shows 'active' with IA Executed. Tribune-Democrat confirms project is actively under construction with White Construction as EPC contractor, validating progression beyond IA execution to physical build-out.
About
Generated Apr 10, 2026 · Predates Oct 25, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
Rogue's Wind is a proposed wind generation project with a total capacity of 109.9 MW, located in Clearfield County, Pennsylvania. The project is in the PJM interconnection queue as entry PJM-AF1-086, with a queue entry date of August 30, 2019, and a proposed commercial operation date of September 1, 2026. The interconnection agreement (IA) has been executed.
The project, which interconnects to PENELEC via the Madera-Westover South 115 kV point of interconnection, has been the subject of recent news coverage.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- PJM queue source as of: Oct 25, 2026.
Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
PA
County
Clearfield
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
PENELEC
Entity
PJM
Service Type
NRIS
Point of Interconnection
Madera-Westover South 115 kV
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- PJM
- Trading Hub
- WESTERN HUB
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- SOUTH
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Last updated 2026-03-26
View all articlesForward forecasts, scenario decomposition, and risk-decision tooling for this queue project.