Rogue's Wind (PJM-AF1-086) — Project Summary

Queue ID
PJM-AF1-086
Capacity
109.9 MW
Technology
Wind
Status
active
Location
Clearfield, PA
Region
PJM
Developer
—
IA Status
IA Executed

Rogue's Wind

PJM-AF1-086BetaActiveWindPJMLBNL + Live

109.9 MW generation in Clearfield, PA · In queue since August 2019 · Proposed COD September 2026

BA: PJMISO/RTO: PJMNERC: RFCRC: PJM

109.9 MW

Capacity

1

Components

Wind

7y 3m

In Queue

IA Executed

IA Phase

COD target: 2026

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

7y 1m

Schedule

3 months past proposed COD

Construction75%
Queue EntryAug 30, 2019

Interconnection request submitted to ISO/RTO

System Impact Study

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Partially in Service - Under Construction

Project under construction

Typical: 18–36 months

Commercial Operation

Proposed COD: 2026-09-01

News-reported activity

From dated articles. These observations may describe earlier stages or other project phases; see the queue record above for reported filing status.

Latest milestoneunder constructionThe Tribune-Democrat · 2025-07-05
Expected CODQ2 2025The Tribune-Democrat · 2025-07-05

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 25, 2026 queue source. Research and queue COD differ; this comparison does not confirm either date. See the queue record for reported project facts.

Research COD
Jun 2025
Differs from queue: Sep 1, 2026
Developer in saved assessment
CPV
From queue filing
Status at research time
Construction
Construction — under construction as of July 2025, targeting Q2 2025 completion
Financing
Secured
Financing secured (construction underway with EPC contractor White Construction engaged)

Milestones in this assessment

IA executed

Interconnection Agreement executed per LBNL queue status

tribdem.com
Groundbreaking2025

Construction underway at Rock Run ATV Park site with White Construction as EPC

tribdem.com
COD targetJun 2025Latest in this assessment

Q2 2025 commercial operation target per developer

tribdem.com
Research sources and reasoning (1 recorded sources)

medium confidence at research time

  1. tribdem.com/news/wind-farm-under-construction-at-rock-run-atv-park/article_817f74d9-a72e-4bb0-9609-156be74ec723.html

Commercial operation date: LBNL proposed COD of Sept 2026 is stale. Tribune-Democrat article from July 2025 reports project 'under construction' with Q2 2025 target COD, indicating the project is tracking ~15 months ahead of the queue filing date.

Developer: LBNL snapshot has null developer field. News extraction identifies CPV as developer with project named 'CPV Rogue's Wind'. No shell LLC vs parent distinction evident.

Status: LBNL shows 'active' with IA Executed. Tribune-Democrat confirms project is actively under construction with White Construction as EPC contractor, validating progression beyond IA execution to physical build-out.

Project lifecycle
as of 2025-07-05
PhaseConstructionThe Tribune-Democrat · 2025-07-05
OperationalNoThe Tribune-Democrat · 2025-07-05
TechnologyWindThe Tribune-Democrat · 2025-07-05
DeveloperCPVThe Tribune-Democrat · 2025-07-05
EPC contractorWhite ConstructionThe Tribune-Democrat · 2025-07-05
GroundbreakingAnnouncedThe Tribune-Democrat · 2025-07-05
Permit decisionGrantedThe Tribune-Democrat · 2025-07-05

About

Saved background

Generated Apr 10, 2026 · Predates Oct 25, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Rogue's Wind is a proposed wind generation project with a total capacity of 109.9 MW, located in Clearfield County, Pennsylvania. The project is in the PJM interconnection queue as entry PJM-AF1-086, with a queue entry date of August 30, 2019, and a proposed commercial operation date of September 1, 2026. The interconnection agreement (IA) has been executed.

The project, which interconnects to PENELEC via the Madera-Westover South 115 kV point of interconnection, has been the subject of recent news coverage.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • PJM queue source as of: Oct 25, 2026.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

PA

County

Clearfield

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

—

Utility

PENELEC

Entity

PJM

Service Type

NRIS

Point of Interconnection

Madera-Westover South 115 kV

Data Source

LBNL + Live

DeveloperCPVThe Tribune-Democrat · 2025-07-05
EPC contractorWhite ConstructionThe Tribune-Democrat · 2025-07-05
TransactionProject financingSeeking Alpha · 2024-08-19
Deal value$300.0MSeeking Alpha · 2024-08-19
OfftakerHarrison StreetSeeking Alpha · 2024-08-19
Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
PJM
Trading Hub
WESTERN HUB
Hub Confidence
HIGH
Nearest Node (Estimated)
SOUTH

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

Insights & Articles (2)Beta

Last updated 2026-03-26

View all articles
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.