Riverstart Solar Park V (PJM-AE2-219) — Project Summary

Queue ID
PJM-AE2-219
Capacity
100 MW
Technology
Solar
Status
active
Location
Randolph, IN
Region
PJM
Developer
—
IA Status
IA Executed

Riverstart Solar Park V

PJM-AE2-219BetaActiveSolarPJMLBNL + Live

100 MW generation in Randolph, IN · In queue since March 2019 · Proposed COD May 2026

BA: MISOISO/RTO: PJMNERC: RFCRC: MISO

100 MW

Capacity

1

Components

Solar

7y 8m

In Queue

IA Executed

IA Phase

COD target: 2026

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

7y 2m

Schedule

6 months past proposed COD

Construction75%
Queue EntryMar 21, 2019

Interconnection request submitted to ISO/RTO

System Impact Study

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Engineering and Procurement

Project under construction

Typical: 12–24 months

Commercial Operation

Proposed COD: 2026-05-31

News-reported activity
as of 8y 7m ago

From dated articles. These observations may describe earlier stages or other project phases; see the queue record above for reported filing status.

Expected COD2022The Star Press · 2018-04-06
Project lifecycle
as of 2025-04-01
PhaseOnlinepv magazine USA · 2025-04-01
Phase history
2018-04IA executed2025-04Online
OperationalNo±The Star Press · 2020-06-13
TechnologySolarpv magazine USA · 2025-04-01
DeveloperEDP Renewablespv magazine USA · 2025-04-01
PPA offtakerAmazonpv magazine USA · 2025-04-01
COD achievedReportedpv magazine USA · 2025-04-01
Permit decisionpendingThe Star Press · 2020-06-13

About

Saved background

Generated Oct 25, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Riverstart Solar Park V is a proposed 100 MW solar generation project located in Randolph County, Indiana. The development project is listed in the PJM Interconnection queue under queue ID PJM-AE2-219 and lies within the service territory of the utility AEP. The project is planned to connect to the grid at the Bluff Point-Randolph 138 kV point of interconnection and has requested Network Resource Interconnection Service (NRIS).

The project entered the PJM queue on March 21, 2019, and currently holds an active status. It has an executed interconnection agreement (IA Executed), and its proposed commercial operation date is May 31, 2026. Riverstart Solar Park V has appeared in recent news coverage, with seven articles referencing the project. The topics span industry and grid matters (two articles each), along with development, deals, and regulatory coverage (one article each).

Summary provenance

Summary generated Oct 25, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • PJM queue source as of: Oct 25, 2026.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

IN

County

Randolph

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

—

Utility

AEP

Entity

PJM

Service Type

NRIS

Point of Interconnection

Bluff Point-Randolph 138 kV

Data Source

LBNL + Live

DeveloperEDP Renewablespv magazine USA · 2025-04-01
ApplicantRiverstart Solar ParkThe Star Press · 2020-06-13
AgencyRandolph County Area Planning CommissionThe Star Press · 2020-06-13
RulingProposed ruleThe Star Press · 2020-06-13
TransactionPPApv magazine USA · 2025-04-01
OfftakerAmazonpv magazine USA · 2025-04-01
PPA structurePhysicalpv magazine USA · 2025-04-01
PPA term25 yearspv magazine USA · 2025-04-01
Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
PJM
Trading Hub
AEP-DAYTON HUB
Hub Confidence
MEDIUM

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

Insights & Articles (5)Beta

Last updated 2026-03-26

View all 5 articles