Pleasant Prairie Solar Energy Center (PJM-AE2-214) — Project Summary

Queue ID
PJM-AE2-214
Capacity
200 MW
Technology
Solar
Status
active
Location
Franklin, OH
Region
PJM
Developer
—
IA Status
IA Executed

Pleasant Prairie Solar Energy Center

PJM-AE2-214BetaActiveSolarPJMLBNL + Live

200 MW generation in Franklin, OH · In queue since March 2019 · Proposed COD December 2027

BA: PJMISO/RTO: PJMNERC: RFCRC: PJM

200 MW

Capacity

1

Components

Solar

7y 8m

In Queue

IA Executed

IA Phase

COD target: 2027

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

8y 9m

Construction75%
Queue EntryMar 23, 2019

Interconnection request submitted to ISO/RTO

System Impact Study

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Under Construction

Project under construction

Typical: 12–24 months

Commercial Operation

Proposed COD: 2027-12-30

News-reported activity
as of 5y 11m ago

From dated articles. These observations may describe earlier stages or other project phases; see the queue record above for reported filing status.

Latest milestoneOPSB certificate application planned · Q1 2021The Columbus Dispatch · 2020-12-12
Expected COD2023The Columbus Dispatch · 2020-12-12

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 25, 2026 queue source. See the queue record for reported project facts.

Research COD
—
Developer in saved assessment
Invenergy
From queue filing
Status at research time
Construction
Construction — groundbreaking occurred June 2024, targeting Q1 2027 COD with Blattner as EPC contractor
Financing
Not recorded

Milestones in this assessment

IA executed

Interconnection Agreement executed per LBNL queue status

solarpowerworldonline.com
GroundbreakingJun 10, 2024

Construction kickoff with Blattner as EPC contractor

solarpowerworldonline.com
COD targetundefined 2027Latest in this assessment

Expected commercial operation Q1 2027

solarpowerworldonline.com
Research sources and reasoning (2 recorded sources)

high confidence at research time

  1. solarpowerworldonline.com/2025/06/invenergy-kicks-off-construction-on-240-mw-ohio-solar-project/
  2. dispatch.com/story/news/2020/12/12/inevergy-proposes-250-megawatt-solar-farm-western-franklin-county/6484053002/

Commercial operation date: LBNL proposed COD of 2027-03-30 aligns with news-extracted Q1 2027 target from Solar Power World article covering construction start in June 2024.

Developer: LBNL snapshot has null developer field. News extraction identifies Invenergy as developer with 0.8 confidence across 2 supporting articles including Solar Power World and Columbus Dispatch.

Status: LBNL shows 'active' with IA Executed status. News confirms construction started June 10, 2024 per Solar Power World, advancing project beyond queue-active to active construction phase.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 25, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Pleasant Prairie Solar Energy Center is a proposed 200 MW solar generation project in Franklin County, Ohio. The project, developed by AEP, is currently active in the PJM interconnection queue as entry AE2-214, with a queue entry date of March 23, 2019. The proposed commercial operation date is March 30, 2027, and the Interconnection Agreement (IA) has been executed.

The Pleasant Prairie Solar Energy Center has been the subject of recent news coverage, with five articles categorized as industry and development related.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • PJM queue source as of: Oct 25, 2026.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

OH

County

Franklin

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

—

Utility

AEP

Entity

PJM

Service Type

NRIS

Point of Interconnection

Cole 345 kV

Data Source

LBNL + Live

DeveloperInvenergyThe Columbus Dispatch · 2020-12-12
Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
PJM
Trading Hub
AEP-DAYTON HUB
Hub Confidence
HIGH
Nearest Node (Estimated)
COLE 34.5 KV PLEPRASP

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

Insights & Articles (4)Beta

Last updated 2026-03-26

View all articles
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.