Potter Solar (PJM-AE2-074) — Project Summary

Queue ID
PJM-AE2-074
Capacity
35 MW
Technology
Solar
Status
operational
Location
Potter, PA
Region
PJM
Developer
—
IA Status
IA Executed

Potter Solar

PJM-AE2-074BetaOperatingSolarPJMLBNL + Live

35 MW generation in Potter, PA · In queue since February 2019 · Proposed COD July 2026

In service since August 2026, according to PJM's queue (Oct 2026). Now operating as Potter Solar.

BA: PJMISO/RTO: PJMNERC: RFCRC: PJM

35 MW

Capacity

1

Components

Solar

7y 9m

In Queue

IA Executed

IA Phase

COD target: 2026

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

4 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

7y 5m

Operational100%
Queue EntryFeb 20, 2019

Interconnection request submitted to ISO/RTO

System Impact Study

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

Construction

Construction completed

Typical: 12–24 months

Commercial Operation

Project is commercially operational

About

Saved background

Generated Apr 10, 2026 · Predates Oct 25, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Potter Solar is a proposed 35 MW solar generation project located in Potter County, Pennsylvania. The project is interconnected within the PJM Interconnection queue as entry AE2-074, with a queue entry date of February 20, 2019. The proposed commercial operation date is July 31, 2026. The project's interconnection status is currently in the System Impact Study phase.

The development is linked to an existing operating plant named Potter Solar (EIA plant ID 67876). The confidence level of the match between the queue project and the existing plant is 85%. The designated point of interconnection (POI) is the Potter 46 kV substation.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • PJM queue source as of: Oct 25, 2026.
Development Risk

Realization history for this asset — final cost vs plan, COD slip vs original date, and construction duration vs cohort. Retrospective context for the operating risk view above. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

Final cost vs plan
COD vs original date
Construction duration vs cohort
Project Details

State

PA

County

Potter

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

—

Utility

APS

Entity

PJM

Service Type

NRIS

Point of Interconnection

Potter 46 kV

Data Source

LBNL + Live

Risk Analytics

Composite operating risk view for this asset — climate hazards across its remaining operating life, observed generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — 10-year P50 trajectory accounting for degradation, observed curtailment, and market conditions, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
Degradation-adjusted CF
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR bands, and refinancing risk for this asset — 10-year cashflow projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year cashflow horizon
P10 / P50 / P90 DSCR bands
Price + demand + policy scenarios
Market Context
Approximate
ISO / RTO
PJM
Trading Hub
WESTERN HUB
Hub Confidence
HIGH
Nearest Node (Estimated)
APS
POI Substation
Potter Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.