Riverstone Solar (PJM-AE1-108) — Project Summary

Queue ID
PJM-AE1-108
Capacity
149.5 MW
Technology
Solar
Status
active
Location
Buckingham, VA
Region
PJM
Developer
—
IA Status
IA Executed

Riverstone Solar

PJM-AE1-108BetaActiveSolarPJMLBNL + Live

149.5 MW generation in Buckingham, VA · In queue since September 2018 · Proposed COD November 2027

BA: PJMISO/RTO: PJMNERC: SERCRC: PJM

149.5 MW

Capacity

1

Components

Solar

8y 2m

In Queue

IA Executed

IA Phase

COD target: 2027

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

9y 2m

Construction75%
Queue EntrySep 13, 2018

Interconnection request submitted to ISO/RTO

System Impact Study

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Under Construction

Project under construction

Typical: 12–24 months

Commercial Operation

Proposed COD: 2027-11-30

News-reported activity

From dated articles. These observations may describe earlier stages or other project phases; see the queue record above for reported filing status.

Latest milestoneconstruction ongoing · 2025WVIR · 2025-10-13

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 25, 2026 queue source. See the queue record for reported project facts.

Research COD
2027
From queue filing
Developer in saved assessment
Apex Clean Energy
From queue filing
Status at research time
Construction
Construction — active construction ongoing as of Oct 2025, under investigation by Buckingham County Board of Supervisors for potential permit violations
Financing
Not recorded

Milestones in this assessment

IA executedSep 13, 2018

Interconnection Agreement executed with PJM (queue date 2018-09-13)

29news.com
Groundbreaking2025

Construction ongoing as of October 2025

29news.com
Permit approvedSep 2025Latest in this assessment

Buckingham County Board of Supervisors investigating potential permit violations and penalties

farmvilleherald.com
Research sources and reasoning (2 recorded sources)

medium confidence at research time

  1. 29news.com/2025/10/13/buckingham-county-environmental-group-brings-attention-potential-affects-solar-farm/
  2. farmvilleherald.com/2025/09/riverstone-solar-faces-potential-penalties/

Commercial operation date: LBNL queue shows proposed COD of 2027-11-30. No press releases or financing announcements found with updated target dates. Construction is ongoing as of Oct 2025, making 2027 plausible but unconfirmed by developer.

Developer: News sources consistently identify Apex Clean Energy as the developer. LBNL queue has null developer field, so no shell-LLC vs parent conflict exists.

Status: LBNL shows 'Active' with IA Executed. News from Oct 2025 confirms construction is underway, and Sept 2025 reports county investigation into potential penalties, indicating active but contentious development.

Project lifecycle
as of 2025-09-17
PhaseConstructionThe Farmville Herald · 2025-08-02
OperationalNoThe Farmville Herald · 2025-09-17
TechnologySolarThe Farmville Herald · 2025-09-17
DeveloperApex Clean EnergyThe Farmville Herald · 2025-09-17
GroundbreakingAnnouncedThe Farmville Herald · 2025-09-17
DelayAnnouncedThe Farmville Herald · 2025-09-17
Permit decisionconditionalThe Farmville Herald · 2025-09-17

About

Saved background

Generated Apr 10, 2026 · Predates Oct 25, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Riverstone Solar is a proposed solar generation project with a total capacity of 149.5 MW, located in Buckingham County, Virginia. The project is interconnected within the PJM Interconnection queue as entry PJM-AE1-108, with a queue entry date of September 13, 2018, and a proposed commercial operation date of November 30, 2027. The interconnection agreement (IA) for the project has been executed.

The proposed project is linked to the existing Riverstone Solar operating plant. Riverstone Solar has been featured in recent news coverage.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • PJM queue source as of: Oct 25, 2026.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

VA

County

Buckingham

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

—

Utility

AEP

Entity

PJM

Service Type

NRIS

Point of Interconnection

Bremo-Scottsville 138 kV

Data Source

LBNL + Live

DeveloperApex Clean EnergyWVIR · 2025-10-13
ApplicantApex Clean EnergyThe Farmville Herald · 2025-09-17
AgencyBuckingham County Board of SupervisorsThe Farmville Herald · 2025-09-17
RulingInvestigationThe Farmville Herald · 2025-09-17
Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
PJM
Trading Hub
DOMINION HUB
Hub Confidence
MEDIUM

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

Insights & Articles (3)Beta

Last updated 2026-03-14

View all articles
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.