Short Mountain Wind Energy (PJM-AD1-125) — Project Summary

Queue ID
PJM-AD1-125
Capacity
80 MW
Technology
Wind
Status
suspended
Location
Hardy, WV
Region
PJM
Developer
—
IA Status
IA Executed

Short Mountain Wind Energy

PJM-AD1-125BetaSuspendedWindPJMLBNL + Live

80 MW generation in Hardy, WV · In queue since September 2017 · Proposed COD December 2027

BA: PJMISO/RTO: PJMNERC: RFCRC: PJM

80 MW

Capacity

1

Components

Wind

9y 2m

In Queue

IA Executed

IA Phase

COD target: 2027

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

10y 3m

Suspended75%
Queue EntrySep 28, 2017

Interconnection request submitted to ISO/RTO

System Impact Study

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

Construction

Construction pending

Typical: 18–36 months

Commercial Operation

Proposed COD: 2027-12-31

News-reported activity

From dated articles. These observations may describe earlier stages or other project phases; see the queue record above for reported filing status.

Latest milestone6 years of operation · 2025-12-24Monadnock Ledger-Transcript · 2026-01-13
Project lifecycle
as of 2026-01-13
PhaseOnlineMonadnock Ledger-Transcript · 2026-01-13
Phase history
2024-11IA executed2026-01Online
OperationalYesMonadnock Ledger-Transcript · 2026-01-13
TechnologyWindMonadnock Ledger-Transcript · 2026-01-13
DeveloperClearway Energy GroupWV News · 2024-11-14
PPA offtakerNew Hampshire Electric Co-op; Mass General Brigham Hospital systemMonadnock Ledger-Transcript · 2026-01-13
Permit decisionGrantedWV News · 2024-11-14

About

Saved background

Generated Oct 25, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Short Mountain Wind Energy is a proposed 80 MW wind generation project located in Hardy County, West Virginia. The development project is listed in the PJM Interconnection queue under queue ID PJM-AD1-125, with APS as the associated transmission utility. The project would connect to the grid at the Baker 138 kV point of interconnection and has requested Network Resource Interconnection Service (NRIS).

The project entered the PJM queue on September 28, 2017, and has a proposed commercial operation date of December 31, 2027. An interconnection agreement has been executed for the project, although its current queue status is listed as suspended. Short Mountain Wind Energy has appeared in recent news coverage, with nine articles identified. Four concern development, four cover industry topics, and one addresses regulatory matters.

Summary provenance

Summary generated Oct 25, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • PJM queue source as of: Oct 25, 2026.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

WV

County

Hardy

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

—

Utility

APS

Entity

PJM

Service Type

NRIS

Point of Interconnection

Baker 138 kV

Data Source

LBNL + Live

DeveloperOmnis Energy±Corporate Knights · 2024-10-18
ApplicantNedpower Mount Storm LLCWV News · 2024-11-14
CompanyStetson WindMassLive.com · 2010-11-28
AgencyPublic Service Commission of West VirginiaWV News · 2024-11-14
RulingApprovalWV News · 2024-11-14
Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
PJM
Trading Hub
AEP-DAYTON HUB
Hub Confidence
HIGH
Nearest Node (Estimated)
FOOTHILL18 KV UNIT 5
POI Substation
Baker Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

Insights & Articles (7)Beta

Last updated 2026-03-26

View all 7 articles
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.