Trade Post Solar Energy Center (PJM-AC2-157) — Project Summary

Queue ID
PJM-AC2-157
Capacity
200 MW
Technology
Solar
Status
active
Location
Sullivan, IN
Region
PJM
Developer
—
IA Status
IA Executed

Trade Post Solar Energy Center

PJM-AC2-157BetaActiveSolarPJMLBNL + Live

200 MW generation in Sullivan, IN · In queue since March 2017 · Proposed COD June 2026

BA: MISOISO/RTO: PJMNERC: RFCRC: MISO

200 MW

Capacity

1

Components

Solar

9y 8m

In Queue

IA Executed

IA Phase

COD target: 2026

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

9y 3m

Schedule

5 months past proposed COD

Construction75%
Queue EntryMar 29, 2017

Interconnection request submitted to ISO/RTO

System Impact Study

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Partially in Service - Under Construction

Project under construction

Typical: 12–24 months

Commercial Operation

Proposed COD: 2026-06-30

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 25, 2026 queue source. See the queue record for reported project facts.

Research COD
Jun 30, 2026
From queue filing
Developer in saved assessment
Invenergy
From queue filing
Status at research time
Active
Active — IA Executed, 200 MW solar project in Sullivan County partnered with NIPSCO
Financing
Not recorded

Milestones in this assessment

IA executed2017Latest in this assessment

Interconnection Agreement executed per LBNL queue status

Research sources and reasoning (1 recorded sources)

low confidence at research time

  1. wthitv.com/news/solar-expansion-in-sullivan-county-a-breakdown/article_e5a1f424-2895-455d-a071-ff7c35e4adcc.html

Commercial operation date: LBNL queue shows 2026-06-30 proposed COD. No recent news or press releases found to validate or contradict this date, so LBNL remains the sole source.

Developer: News extraction identifies Invenergy as developer with NIPSCO as partner/offtaker. LBNL queue snapshot has null developer field, so news provides the only available identification.

Status: LBNL shows 'active' status with IA Executed. News confirms Invenergy development with NIPSCO partnership, consistent with active interconnection agreement status.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 25, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Trade Post Solar Energy Center is a proposed 200 MW solar generation project located in Sullivan County, Indiana. The project, developed under the utility AEP, is in the PJM interconnection queue as entry PJM-AC2-157, with a queue entry date of March 29, 2017. The proposed commercial operation date is June 30, 2026, and the interconnection agreement has been executed.

The Trade Post Solar Energy Center has been the subject of recent news coverage.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • PJM queue source as of: Oct 25, 2026.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

IN

County

Sullivan

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

—

Utility

AEP

Entity

PJM

Service Type

NRIS

Point of Interconnection

Sullivan 345 kV

Data Source

LBNL + Live

DeveloperInvenergyCleanTechnica · 2025-05-01
PartnerNIPSCOWTHI-TV · 2025-11-26
CompanyInvenergyWTHI-TV · 2025-11-26
TransactionDebt financingCleanTechnica · 2025-05-01
Deal value$2.5B±CleanTechnica · 2025-05-01
LenderNatixis Corporate & Investment Banking, Canadian Imperial Bank of Commerce, Nomura, Rabobank, Wells FargoPower Technology · 2025-01-30
Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
PJM
Trading Hub
N ILLINOIS HUB
Hub Confidence
MEDIUM
Nearest Node (Estimated)
SULLIVAN-AEP
POI Substation
Sullivan Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

Insights & Articles (4)Beta

Last updated 2026-03-26

View all articles
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.