Walnut Solar I
50 MW generation in King And Queen, VA · In queue since September 2016 · Proposed COD July 2026
50 MW
Capacity
1
Components
Solar
10y 2m
In Queue
IA Executed
IA Phase
Signed Nov 2019
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Queue → IA
3y 2m
IA → COD
6y 8m
Total Duration
3y 2m
Schedule
4 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Partially in Service - Under Construction
Project under construction
Typical: 12–24 months
Proposed COD: 2026-07-14
About
Generated Oct 25, 2026
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
Walnut Solar I is a proposed 50 MW solar generation project located in King and Queen County, Virginia. The development project is listed in the PJM Interconnection queue under queue ID PJM-AC1-065, with Dominion as the interconnecting utility. It is planned to connect to the grid at the Harmony Village-Shackleford 115kV point of interconnection and has requested Network Resource Interconnection Service (NRIS). The project consists of a single solar component, with no co-located storage or other technologies identified in the queue data.
The project entered the PJM queue on September 22, 2016, and its status is currently active. An interconnection agreement was executed on November 10, 2019, marking a significant milestone in the interconnection process. The proposed commercial operation date for Walnut Solar I is July 14, 2026, nearly a decade after its initial queue entry.
Summary provenance
Summary generated Oct 25, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- PJM queue source as of: Oct 25, 2026.
Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
VA
County
King And Queen
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
Dominion
Entity
PJM
Service Type
NRIS
Point of Interconnection
Harmony Village-Shackleford 115kV
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- PJM
- Trading Hub
- DOMINION HUB
- Hub Confidence
- HIGH
- POI Substation
- HARMONY
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Walnut
Data-driven briefing on Walnut — fleet, generation, financial, and news signals.
500 Virginia Solar
Data tables and metrics from the InfraSure database.
Walnut Solar I
Data-driven briefing on Walnut Solar I — fleet, generation, financial, and news signals.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.