Sullivan Generating Station 1
575 MW generation in Sullivan, IN · In queue since October 2015 · Proposed COD December 2028
575 MW
Capacity
1
Components
Gas
11y 1m
In Queue
IA Executed
IA Phase
COD target: 2028
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
13y 2m
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Under Construction
Project under construction
Typical: 24–48 months
Proposed COD: 2028-12-31
From dated articles. These observations may describe earlier stages or other project phases; see the queue record above for reported filing status.
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Research sources and reasoning (2 recorded sources)
low confidence at research time
- cleanview.co/power-projects/planned/natural-gas-power-plants/indiana/AB1-087/sullivan-generating-station-1
- cleanview.co/power-projects/planned/natural-gas-power-plants/indiana
Commercial operation date: The only COD signal is the LBNL proposed COD of 2028-12-31. The Cleanview listing ("Expected Online: December 2028") matches it but likely derives from the same queue data, so it is not independent. No developer or press release gives a different date.
Developer: LBNL lists no developer. The news-extracted 'Homer City Redevelopment' comes from an article about the Homer City, Pennsylvania campus, not this Sullivan County, Indiana project, so I rejected it as a mismatch. The Hallador Turtle Creek (460 MW) and Merom coverage cannot be tied to queue ID AB1-087 because the MW and name do not match, so I did not attribute it.
Status: LBNL shows status active and IA Executed, and nothing in the search results contradicts it. Cleanview and Infrasure list the project as planned and active.
About
Generated Apr 10, 2026 · Predates Oct 25, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The Sullivan Generating Station 1 is a proposed 575 MW gas-fired generation project located in Sullivan County, Indiana. The project, developed by AEP, is in the PJM interconnection queue as entry PJM-AB1-087, with a queue entry date of October 1, 2015. Its proposed commercial operation date is December 31, 2028, and the interconnection agreement has been executed.
The proposed project is interconnected at the Sullivan 345kV #1 point of interconnection. The Sullivan Generating Station 1 project has been the subject of recent news coverage, with 22 articles categorized as industry and regulatory news.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- PJM queue source as of: Oct 25, 2026.
Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
IN
County
Sullivan
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
AEP
Entity
PJM
Service Type
NRIS
Point of Interconnection
Sullivan 345kV #1
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- PJM
- Trading Hub
- AEP-DAYTON HUB
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- SULLIVAN69 KV T1
- POI Substation
- Sullivan Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Last updated 2026-04-09
View all 5 articlesSullivan Generating Station 1
Data-driven briefing on Sullivan Generating Station 1 — fleet, generation, financial, and news signals.
Narrows Gas Turbines Generating
Data-driven briefing on Sullivan Generating Station 1 — fleet, generation, financial, and news signals.
Sullivan
Data-driven briefing on Sullivan — fleet, generation, financial, and news signals.
ATI
Data-driven briefing on ATI — fleet, generation, financial, and news signals.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.