Maryland Offshore Wind Energy Project (MOWEP) (PJM-AB1-056) — Project Summary

Queue ID
PJM-AB1-056
Capacity
247.8 MW
Technology
Offshore Wind
Status
suspended
Location
Sussex, DE
Region
PJM
Developer
IA Status
IA Executed

Maryland Offshore Wind Energy Project (MOWEP)

PJM-AB1-056BetaSuspendedOffshore WindPJMLBNL + Live

247.8 MW generation in Sussex, DE · In queue since August 2015 · Proposed COD December 2027

BA: PJMISO/RTO: PJMNERC: RFCRC: PJM

247.8 MW

Capacity

1

Components

Offshore Wind

10y 11m

In Queue

IA Executed

IA Phase

Signed Aug 2018

Interconnection

Queue → IA

3 years

IA → COD

9y 4m

Total Duration

3 years

Suspended75%
Queue EntryAug 31, 2015

Interconnection request submitted to ISO/RTO

System Impact Study

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection AgreementAug 28, 2018

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

Construction

Construction pending

Typical: 36–60 months

Commercial Operation

Proposed COD: 2027-12-31

About

The Maryland Offshore Wind Energy Project (MOWEP), a proposed generation project, is located in Sussex County, Delaware. The project, with a total capacity of 247.8 MW, consists of offshore wind technology. It is listed in the PJM interconnection queue as entry AB1-056, with a queue entry date of August 31, 2015. The proposed commercial operation date is December 31, 2027. The project's interconnection agreement has been executed.

The proposed project is interconnected to the grid via Delmarva Power & Light (DPL) at the Indian River 230kV I point of interconnection. The project's status is currently listed as suspended within the PJM queue.

Generated from interconnection queue and public data sources

Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

DE

County

Sussex

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

Utility

DPL

Entity

PJM

Service Type

NRIS

Point of Interconnection

Indian River 230kV I

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
PJM
Trading Hub
WESTERN HUB
Hub Confidence
HIGH
Nearest Node (Estimated)
INDIANRI13 KV UNIT10
POI Substation
Indian River South Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.