Project PGE-07-024 — Project Summary

Queue ID
PGE-07-024
Capacity
100 MW
Technology
Gas
Status
suspended
Location
Columbia, OR
Region
West
Developer
—
IA Status
—

PGE-07-024

PGE-07-024BetaSuspendedGasPGELBNL

100 MW generation in Columbia, OR · In queue since October 2007 · Proposed COD December 2011

BA: BPATNERC: WECCRC: RCW

100 MW

Capacity

1

Components

Gas

19y 1m

In Queue

—

IA Status

COD target: 2011

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

4 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

4y 2m

Suspended0%
Queue EntryOct 9, 2007

Interconnection request submitted to ISO/RTO

Interconnection Study

Project undergoes interconnection studies to assess grid impact.

Typical: 18–36 months

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2011-12-01

About

Saved background

Generated Oct 25, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Queue ID PGE-07-024 is a proposed 100 MW natural gas generation project in Columbia County, Oregon, in the western United States. The project was submitted to the interconnection queue administered by Portland General Electric (PGE), the utility serving the area, rather than to an organized ISO/RTO market. Its proposed point of interconnection is the PGE Beaver Generation Site, and it requested Network Resource Interconnection Service (NRIS). The project consists of a single gas-fired component rated at 100 MW.

The project entered PGE's interconnection queue on October 9, 2007, with a proposed commercial operation date of December 1, 2011. That date has passed, and the project's queue status is listed as suspended. The available data does not indicate the status of an interconnection agreement, does not name a developer, and does not link the project to an existing operating plant in EIA records.

Summary provenance

Summary generated Oct 25, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • LBNL queue source as of: Dec 31, 2025.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

OR

County

Columbia

Grid Region

Mountain West

Market

—

Developer

—

Utility

Portland General Electric

Entity

PGE

Service Type

NRIS

Point of Interconnection

PGE Beaver Generation Site

Data Source

LBNL

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
MOUNTAIN_WEST
Trading Hub
MID-C
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.