Project PGE-07-022 — Project Summary

Queue ID
PGE-07-022
Capacity
375 MW
Technology
Wind
Status
suspended
Location
Jefferson, OR
Region
West
Developer
—
IA Status
—

PGE-07-022

PGE-07-022BetaSuspendedWindPGELBNL

375 MW generation in Jefferson, OR · In queue since September 2007 · Proposed COD December 2012

BA: BPATNERC: WECCRC: RCW

375 MW

Capacity

1

Components

Wind

19y 2m

In Queue

—

IA Status

COD target: 2012

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

4 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

5y 3m

Suspended0%
Queue EntrySep 4, 2007

Interconnection request submitted to ISO/RTO

Interconnection Study

Project undergoes interconnection studies to assess grid impact.

Typical: 18–36 months

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2012-12-01

About

Saved background

Generated Oct 25, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The proposed project identified by queue ID PGE-07-022 is a 375 MW wind generation development in Jefferson County, Oregon, in the western United States. The project consists of a single wind component totaling 375 MW. It was submitted to the interconnection queue administered by Portland General Electric (PGE), which is listed as the interconnecting utility. No developer is identified in the available data.

The project entered the queue on September 4, 2007, and requested Network Resource Interconnection Service (NRIS). Its proposed point of interconnection is described as a new location between Boardman and Warm Springs. The original proposed commercial operation date was December 1, 2012. The project's interconnection request is currently listed as suspended, and no interconnection agreement status is reported.

Summary provenance

Summary generated Oct 25, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • LBNL queue source as of: Dec 31, 2025.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

OR

County

Jefferson

Grid Region

Mountain West

Market

—

Developer

—

Utility

Portland General Electric

Entity

PGE

Service Type

NRIS

Point of Interconnection

A new location between Boardman and Warm Springs

Data Source

LBNL

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
MOUNTAIN_WEST
Trading Hub
MID-C
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.