Project PGE-07-019 — Project Summary

Queue ID
PGE-07-019
Capacity
385 MW
Technology
Coal
Status
suspended
Location
Morrow, OR
Region
West
Developer
—
IA Status
—

PGE-07-019

PGE-07-019BetaSuspendedCoalPGELBNL

385 MW generation in Morrow, OR · In queue since September 2007 · Proposed COD December 2012

BA: BPATNERC: WECCRC: RCW

385 MW

Capacity

1

Components

Coal

19y 2m

In Queue

—

IA Status

COD target: 2012

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

4 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

5y 3m

Suspended0%
Queue EntrySep 4, 2007

Interconnection request submitted to ISO/RTO

Interconnection Study

Project undergoes interconnection studies to assess grid impact.

Typical: 18–36 months

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2012-12-01

About

Saved background

Generated Oct 25, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

PGE-07-019 is a proposed 385 MW coal-fired generation project located in Morrow County, Oregon, in the western United States. The project appears in the interconnection queue administered by Portland General Electric (PGE), which is the transmission provider for the request. No developer or project name is identified in the available data, so the project is referred to by its queue identifier. The project consists of a single coal generation component with a capacity of 385 MW.

The interconnection request entered PGE's queue on September 4, 2007, and specified a proposed commercial operation date of December 1, 2012. The project sought Network Resource Interconnection Service (NRIS) at a point of interconnection identified as the proposed Grassland Substation at 500 kV. The request currently holds a suspended status in the queue. The available data does not report the status of an interconnection agreement, any link to an existing operating plant, or any news coverage of the project.

Summary provenance

Summary generated Oct 25, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • LBNL queue source as of: Dec 31, 2025.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

OR

County

Morrow

Grid Region

Mountain West

Market

—

Developer

—

Utility

Portland General Electric

Entity

PGE

Service Type

NRIS

Point of Interconnection

Proposed Grassland Substation @ 500 kV

Data Source

LBNL

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
MOUNTAIN_WEST
Trading Hub
MID-C
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.