Project PacifiCorp-T2-052 — Project Summary

Queue ID
PacifiCorp-T2-052
Capacity
340 MW
Technology
Solar+Battery
Status
active
Location
Emery, UT
Region
West
Developer
—
IA Status
—

PacifiCorp-T2-052

PacifiCorp-T2-052BetaActiveSolarBatteryPacifiCorpLBNL

340 MW hybrid in Emery, UT · In queue since September 2025 · Proposed COD May 2029

BA: PACENERC: WECCRC: RCW

340 MW

Capacity

1

Components

Solar

1y 2m

In Queue

—

IA Status

COD target: 2029

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

4 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

3y 8m

Study Phase

Transition Cluster 2

Pre-Study0%
Queue EntrySep 12, 2025

Interconnection request submitted to ISO/RTO

Interconnection Study

Project undergoes interconnection studies to assess grid impact.

Typical: 18–36 months

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-05-31

About

Saved background

Generated Oct 25, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

PacifiCorp-T2-052 is a proposed solar-plus-battery hybrid development project in Emery County, Utah, in the western United States. The project has a total capacity of 340 megawatts (MW). Its components include a 340 MW solar facility paired with battery energy storage, though no separate capacity is specified for the battery. The project would interconnect at the Camp Williams – Emery transmission line within the PacifiCorp system. PacifiCorp is listed as both the utility and the interconnecting entity.

The project entered PacifiCorp's interconnection queue on September 12, 2025, and remains active. It is being evaluated as part of PacifiCorp's Transition Cluster 2 study phase. It has requested Network Resource Interconnection Service (NRIS). The proposed commercial operation date is May 31, 2029. The available data does not indicate the status of an interconnection agreement or identify a developer.

Summary provenance

Summary generated Oct 25, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • LBNL queue source as of: Dec 31, 2025.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

UT

County

Emery

Grid Region

Mountain West

Market

—

Developer

—

Utility

PacifiCorp

Entity

PacifiCorp

Service Type

NRIS

Point of Interconnection

Camp Williams - Emery transmission line

Data Source

LBNL

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
MOUNTAIN_WEST
Trading Hub
FOURCORNERS
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.

No Ask reports yet for this entity.

Ask about Project PacifiCorp-T2-052
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.