Project PacifiCorp-T2-033 — Project Summary

Queue ID
PacifiCorp-T2-033
Capacity
600 MW
Technology
Gas
Status
active
Location
Sweetwater, WY
Region
West
Developer
PacifiCorp
IA Status
—

PacifiCorp-T2-033

PacifiCorp-T2-033BetaActiveGasPacifiCorpLBNL

600 MW generation in Sweetwater, WY · In queue since September 2025 · Proposed COD December 2030

BA: PACENERC: WECCRC: SPPW

600 MW

Capacity

1

Components

Gas

1y 2m

In Queue

—

IA Status

COD target: 2030

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

5y 3m

Study Phase

Transition Cluster 2

Pre-Study0%
Queue EntrySep 5, 2025

Interconnection request submitted to ISO/RTO

Interconnection Study

Project undergoes interconnection studies to assess grid impact.

Typical: 18–36 months

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2030-12-31

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Dec 31, 2030
From queue filing
Developer in saved assessment
PacifiCorp
From queue filing
Status at research time
Active
Active in the PacifiCorp queue (queue date 2025-09-05); no IA executed or date recorded, and no external information on construction or permitting.
Financing
Not recorded
Research sources and reasoning (0 recorded sources)

low confidence at research time

No source list recorded with this assessment.

Commercial operation date: Only the LBNL snapshot is available, with a proposed COD of 2030-12-31. No news or search findings were provided to corroborate or contradict it.

Developer: The LBNL filing names PacifiCorp directly, which is an operating utility and not a shell LLC. No external sources were available to confirm or contradict it.

Status: LBNL lists status as active with no IA status or date. No news or search findings were available to refine this.

About

Saved background

Generated Oct 25, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

PacifiCorp-T2-033 is a proposed 600 MW natural gas-fired generation project located in Sweetwater County, Wyoming, in the western United States. The development project is being pursued by PacifiCorp, which also serves as the interconnecting utility and the entity administering the queue. The project consists of a single gas generation component totaling 600 MW and would connect to the grid at the Anticline substation.

The project entered PacifiCorp's interconnection queue on September 5, 2025, and is currently listed with an active status. It is being studied as part of Transition Cluster 2 and has requested Energy Resource Interconnection Service (ERIS). The proposed commercial operation date is December 31, 2030. The available data does not indicate the status of an interconnection agreement for the project.

Summary provenance

Summary generated Oct 25, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • LBNL queue source as of: Dec 31, 2025.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

WY

County

Sweetwater

Grid Region

Mountain West

Market

—

Developer

PacifiCorp

Utility

PacifiCorp

Entity

PacifiCorp

Service Type

ERIS

Point of Interconnection

Anticline substation

Data Source

LBNL

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
MOUNTAIN_WEST
Trading Hub
FOURCORNERS
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.