Project PacifiCorp-T2-032 — Project Summary

Queue ID
PacifiCorp-T2-032
Capacity
204.6 MW
Technology
Solar+Battery
Status
active
Location
Jefferson, OR
Region
West
Developer
PacifiCorp
IA Status
—

PacifiCorp-T2-032

PacifiCorp-T2-032BetaActiveSolarBatteryPacifiCorpLBNL

204.6 MW hybrid in Jefferson, OR · In queue since September 2025 · Proposed COD December 2028

BA: BPATNERC: WECCRC: RCW

204.6 MW

Capacity

1

Components

Solar

1y 2m

In Queue

—

IA Status

COD target: 2028

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

3y 3m

Study Phase

Transition Cluster 2

Pre-Study0%
Queue EntrySep 4, 2025

Interconnection request submitted to ISO/RTO

Interconnection Study

Project undergoes interconnection studies to assess grid impact.

Typical: 18–36 months

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-12-31

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Dec 31, 2028
From queue filing
Developer in saved assessment
PacifiCorp
From queue filing
Status at research time
Active
Active — queue position secured, no public information on permitting or construction timeline
Financing
Not recorded

Milestones in this assessment

IA executedSep 4, 2025Latest in this assessment

Entered PacifiCorp interconnection queue as T2-032

Research sources and reasoning (0 recorded sources)

low confidence at research time

No source list recorded with this assessment.

Commercial operation date: Only LBNL queue data available with proposed COD of 2028-12-31. No independent news or research sources to validate or contradict this date.

Developer: LBNL lists PacifiCorp as developer, which is the utility itself rather than a shell LLC. No news sources available to confirm if this is utility-owned or third-party developed.

Status: LBNL status shows active queue position. No news coverage to indicate construction progress, permitting status, or project advancement beyond initial interconnection request.

About

Saved background

Generated Oct 25, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

PacifiCorp-T2-032 is a proposed solar-plus-battery hybrid development project in Jefferson County, Oregon, in the western United States. The project has a total capacity of 204.6 megawatts (MW). The listed components include a 204.6 MW solar facility and a battery storage element, though no separate capacity is specified for the battery. PacifiCorp is identified as the developer, the utility, and the interconnection entity for the project.

The project entered PacifiCorp's interconnection queue on September 4, 2025, and is currently listed as active. It is being studied as part of Transition Cluster 2 and has requested Energy Resource Interconnection Service (ERIS). The proposed point of interconnection is the Cove substation. The project's proposed commercial operation date is December 31, 2028. The available data does not indicate the status of an interconnection agreement.

Summary provenance

Summary generated Oct 25, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • LBNL queue source as of: Dec 31, 2025.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

OR

County

Jefferson

Grid Region

Mountain West

Market

—

Developer

PacifiCorp

Utility

PacifiCorp

Entity

PacifiCorp

Service Type

ERIS

Point of Interconnection

Cove substation

Data Source

LBNL

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
MOUNTAIN_WEST
Trading Hub
MID-C
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.