Project PacifiCorp-T2-004 — Project Summary

Queue ID
PacifiCorp-T2-004
Capacity
20 MW
Technology
Geothermal
Status
active
Location
Sevier, UT
Region
West
Developer
—
IA Status
—

PacifiCorp-T2-004

PacifiCorp-T2-004BetaActiveGeothermalPacifiCorpLBNL

20 MW generation in Sevier, UT · In queue since August 2025

BA: PACENERC: WECCRC: RCW

20 MW

Capacity

1

Components

Geothermal

1y 3m

In Queue

—

IA Status

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

4 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

1y 3m

Study Phase

Transition Cluster 2

Pre-Study0%
Queue EntryAug 15, 2025

Interconnection request submitted to ISO/RTO

Interconnection Study

Project undergoes interconnection studies to assess grid impact.

Typical: 18–36 months

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Commercial operation date not yet determined

About

Saved background

Generated Oct 25, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

PacifiCorp-T2-004 is a proposed 20 MW geothermal generation project located in Sevier County, Utah, in the western United States. The development project consists of a single geothermal component with a capacity of 20 MW. It is listed in the interconnection queue administered by PacifiCorp, which is also identified as the utility and interconnecting entity for the project. The project's proposed point of interconnection is the Sevier substation.

The project entered the PacifiCorp interconnection queue on August 15, 2025, and currently holds an active status. It is being evaluated as part of PacifiCorp's Transition Cluster 2 study phase and has requested Energy Resource Interconnection Service (ERIS). The available data does not specify a developer, a proposed commercial operation date, or the status of an interconnection agreement for the project.

Summary provenance

Summary generated Oct 25, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • LBNL queue source as of: Dec 31, 2025.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

UT

County

Sevier

Grid Region

Mountain West

Market

—

Developer

—

Utility

PacifiCorp

Entity

PacifiCorp

Service Type

ERIS

Point of Interconnection

Sevier substation

Data Source

LBNL

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
MOUNTAIN_WEST
Trading Hub
FOURCORNERS
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.