Project PacifiCorp-S0005 — Project Summary

Queue ID
PacifiCorp-S0005
Capacity
250 MW
Technology
Solar
Status
active
Location
Carbon, WY
Region
West
Developer
PacifiCorp
IA Status
In Progress (unknown study)

PacifiCorp-S0005

PacifiCorp-S0005BetaActiveSolarPacifiCorpLBNL

250 MW generation in Carbon, WY · In queue since March 2022 · Proposed COD January 2026

BA: PACENERC: WECCRC: SPPW

250 MW

Capacity

1

Components

Solar

4y 8m

In Queue

In Progress (unknown study)

IA Phase

COD target: 2026

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

3y 10m

Schedule

11 months past proposed COD

In Study38%
Queue EntryMar 7, 2022

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

Project undergoes interconnection studies to assess grid impact.

Typical: 18–36 months

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2026-01-02

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Jan 2, 2026
From queue filing
Developer in saved assessment
PacifiCorp
From queue filing
Status at research time
Active
Active — In Progress interconnection study, no public milestones announced
Financing
Not recorded
Research sources and reasoning (0 recorded sources)

low confidence at research time

No source list recorded with this assessment.

Commercial operation date: Only LBNL queue data available with proposed COD of January 2026. No independent news or research sources to validate or contradict this date.

Developer: LBNL lists PacifiCorp as developer, which is the regulated utility itself rather than a shell LLC. No external sources available to confirm or provide additional context on project ownership.

Status: LBNL queue status shows active with interconnection study in progress. No news coverage or public announcements found to provide ground-truth validation of current project state.

About

Saved background

Generated Apr 10, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

PacifiCorp-S0005 is a proposed 250 MW solar generation project located in Carbon County, Wyoming. The project, being developed by PacifiCorp, entered the PacifiCorp interconnection queue on March 7, 2022, with a proposed commercial operation date of January 2, 2026. The point of interconnection is the Shirley Basin substation.

The interconnection agreement for the project is currently listed as "In Progress (unknown study)". The project has appeared in recent news coverage regarding PacifiCorp's renewable energy development plans in the West region.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • LBNL queue source as of: Dec 31, 2025.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

WY

County

Carbon

Grid Region

Mountain West

Market

—

Developer

PacifiCorp

Utility

PacifiCorp

Entity

PacifiCorp

Service Type

ERIS

Point of Interconnection

Shirley Basin substation

Data Source

LBNL

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
MOUNTAIN_WEST
Trading Hub
FOURCORNERS
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.