PacifiCorp-PIS105
199 MW hybrid in Emery, UT · In queue since December 2025 · Proposed COD December 2026
199 MW
Capacity
1
Components
Solar
11 months
In Queue
In Progress (unknown study)
IA Phase
COD target: 2026
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
1 year
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2026-12-01
About
Generated Oct 25, 2026
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
PacifiCorp-PIS105 is a proposed solar-plus-battery hybrid development project located in Emery County, Utah, in the western United States. The project has a total capacity of 199 MW, with the solar component listed at 199 MW. Although the project is classified as a hybrid incorporating both solar and battery storage technologies, a separate capacity figure for the battery component is not specified in the available data. The proposed point of interconnection is the Huntington-Pinto transmission line, and the project has requested Energy Resource Interconnection Service (ERIS).
The project is in PacifiCorp's interconnection queue, where it entered on December 18, 2025, and is listed as active. PacifiCorp is identified as both the interconnecting utility and the responsible entity, and no separate developer is named. The interconnection agreement status is reported as in progress, though the specific study phase is not identified. The proposed commercial operation date is December 1, 2026, roughly one year after the queue entry date.
Summary provenance
Summary generated Oct 25, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- LBNL queue source as of: Dec 31, 2025.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
UT
County
Emery
Grid Region
Mountain West
Market
—
Developer
—
Utility
PacifiCorp
Entity
PacifiCorp
Service Type
ERIS
Point of Interconnection
Huntington-Pinto transmission line
Data Source
LBNL
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- MOUNTAIN_WEST
- Trading Hub
- FOURCORNERS
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No Ask reports yet for this entity.
Ask about Project PacifiCorp-PIS105Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.