Project PacifiCorp-PIS097 — Project Summary

Queue ID
PacifiCorp-PIS097
Capacity
199.9 MW
Technology
Battery
Status
active
Location
Crook, OR
Region
West
Developer
PacifiCorp
IA Status
In Progress (unknown study)

PacifiCorp-PIS097

PacifiCorp-PIS097BetaActiveBatteryPacifiCorpLBNL

199.9 MW storage in Crook, OR · In queue since November 2024 · Proposed COD December 2028

BA: BPATNERC: WECCRC: RCW

199.9 MW

Capacity

1

Components

Battery

2 years

In Queue

In Progress (unknown study)

IA Phase

COD target: 2028

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

4y 1m

In Study38%
Queue EntryNov 27, 2024

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

Project undergoes interconnection studies to assess grid impact.

Typical: 18–36 months

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-12-31

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Dec 31, 2028
From queue filing
Developer in saved assessment
PacifiCorp
From queue filing
Status at research time
Active
Active — utility-owned battery storage in early interconnection study phase
Financing
Not recorded

Milestones in this assessment

IA executedNov 2024Latest in this assessment

Entered PacifiCorp interconnection queue

Research sources and reasoning (0 recorded sources)

low confidence at research time

No source list recorded with this assessment.

Commercial operation date: Only LBNL queue data available with proposed COD of 2028-12-31. No independent sources to validate or contradict this date.

Developer: LBNL lists PacifiCorp as developer. This is the utility itself, not a shell LLC, suggesting utility-owned storage. No external sources to confirm or provide additional context.

Status: LBNL status is 'active' with IA 'In Progress (unknown study)'. Queue entry is recent (Nov 2024), consistent with early-stage development.

About

Saved background

Generated Apr 10, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

PacifiCorp-PIS097 is a proposed battery storage project with a total capacity of 199.9 MW. The project is located in Crook County, Oregon, and is being developed by PacifiCorp. It consists of a single battery component with a capacity of 199.9 MW.

The project is currently in the PacifiCorp interconnection queue as entry PIS097, with a queue entry date of November 27, 2024. The proposed commercial operation date is December 31, 2028. The interconnection agreement status is listed as "In Progress (unknown study)". The point of interconnection is the Corral substation.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • LBNL queue source as of: Dec 31, 2025.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

OR

County

Crook

Grid Region

Mountain West

Market

—

Developer

PacifiCorp

Utility

PacifiCorp

Entity

PacifiCorp

Service Type

NRIS/ERIS

Point of Interconnection

Corral substation

Data Source

LBNL

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
MOUNTAIN_WEST
Trading Hub
MID-C
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.