Project PacifiCorp-C2-156 — Project Summary

Queue ID
PacifiCorp-C2-156
Capacity
175 MW
Technology
Solar+Battery
Status
suspended
Location
Linn, OR
Region
West
Developer
Sand Ridge PV I, LLC
IA Status
Suspended

PacifiCorp-C2-156

PacifiCorp-C2-156BetaSuspendedSolarBatteryPacifiCorpLBNL

175 MW hybrid in Linn, OR · In queue since May 2022 · Proposed COD February 2028

BA: BPATNERC: WECCRC: RCW

175 MW

Capacity

1

Components

Solar

4y 2m

In Queue

Suspended

IA Phase

COD target: 2028

Interconnection

Total Duration

5y 9m

Study Phase

Cluster 2

Suspended38%
Queue EntryMay 15, 2022

Interconnection request submitted to ISO/RTO

Interconnection Study

Project undergoes interconnection studies to assess grid impact.

Typical: 18–36 months

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-02-01

About

PacifiCorp-C2-156 is a proposed 175 MW hybrid solar and battery project located in Linn County, Oregon. The development project consists of 175 MW of solar capacity. It is listed in the PacifiCorp interconnection queue (queue entry date: May 15, 2022) with a proposed commercial operation date of December 1, 2026. The project's interconnection status is currently in the Facility Study phase, and the point of interconnection is the Alvey-Fry transmission line.

Generated from interconnection queue and public data sources

Development Risk

Realization risk through commissioning — schedule slippage, construction cost overrun, and COD probability vs the stated window. The diligence view that determines whether the project comes online when promised. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD within window)
Cost overrun probability
Schedule slippage vs plan
Project Details

State

OR

County

Linn

Grid Region

Mountain West

Market

Developer

Sand Ridge PV I, LLC

Utility

PacifiCorp

Entity

PacifiCorp

Service Type

ERIS

Point of Interconnection

Alvey-Fry transmission line

Data Source

LBNL

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with curtailment risk decomposed by congestion zone and ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
Curtailment risk by node
Weather + policy scenarios
Financial Forecast

Forward revenue, first-year DSCR, and construction cost overrun exposure — what determines whether the deal clears its covenants once online. Projected across price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

First-year DSCR
Cost overrun probability
Price + demand scenarios
Market Context
Approximate
ISO / RTO
MOUNTAIN_WEST
Trading Hub
MID-C
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.

No Ask reports yet for this entity.

Ask about Project PacifiCorp-C2-156
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.