Project PacifiCorp-C2-05 — Project Summary

Queue ID
PacifiCorp-C2-05
Capacity
199.9 MW
Technology
Gas
Status
active
Location
Juab, UT
Region
West
Developer
PacifiCorp
IA Status
Facility Study

PacifiCorp-C2-05

PacifiCorp-C2-05BetaActiveGasPacifiCorpLBNL

199.9 MW generation in Juab, UT · In queue since April 2022 · Proposed COD December 2026

BA: PACENERC: WECCRC: RCW

199.9 MW

Capacity

1

Components

Gas

4y 7m

In Queue

Facility Study

IA Phase

COD target: 2026

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

4y 8m

Study Phase

Cluster 2

Facilities Study50%
Queue EntryApr 1, 2022

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

Project undergoes interconnection studies to assess grid impact.

Typical: 18–36 months

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2026-12-15

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Dec 15, 2026
From queue filing
Developer in saved assessment
PacifiCorp
From queue filing
Status at research time
Active
Active — Facility Study phase per LBNL queue position as of April 2022
Financing
Not recorded

Milestones in this assessment

IA executedApr 2022Latest in this assessment

Entered PacifiCorp queue for Facility Study phase

Research sources and reasoning (0 recorded sources)

low confidence at research time

No source list recorded with this assessment.

Commercial operation date: Only LBNL queue data available with proposed COD of December 2026. No independent news or research sources to validate or contradict this date.

Developer: LBNL lists PacifiCorp as developer, which is the operating utility itself (not a shell LLC). No external sources available to confirm or provide additional context.

Status: LBNL reports active status in Facility Study phase. No news or research available to indicate construction progress, withdrawal, or status changes since queue entry.

About

Saved background

Generated Apr 10, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

PacifiCorp-C2-05 is a proposed 199.9 MW battery storage project located in Juab County, Utah. The development project, sponsored by PacifiCorp, consists entirely of battery storage. It is currently active in the PacifiCorp interconnection queue, with an entry date of April 1, 2022, and a proposed commercial operation date of December 15, 2026. The point of interconnection is the Mona substation.

The project is located in the western region of the United States. As of the latest data, the project does not have an interconnection agreement (IA) in place, nor is it linked to an existing operating plant in the EIA database. There is no indication of recent news coverage related to this project.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • LBNL queue source as of: Dec 31, 2025.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

UT

County

Juab

Grid Region

Mountain West

Market

—

Developer

PacifiCorp

Utility

PacifiCorp

Entity

PacifiCorp

Service Type

ERIS

Point of Interconnection

Mona substation

Data Source

LBNL

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
MOUNTAIN_WEST
Trading Hub
FOURCORNERS
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.