PacifiCorp-C1-35
500 MW generation in Carbon, WY · In queue since May 2021 · Proposed COD July 2028
500 MW
Capacity
1
Components
Wind
5y 6m
In Queue
IA Executed
IA Phase
COD target: 2028
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
7y 2m
Study Phase
Cluster 1
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Project under construction
Typical: 18–36 months
Proposed COD: 2028-07-11
From dated articles. These observations may describe earlier stages or other project phases; see the queue record above for reported filing status.
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Research sources and reasoning (2 recorded sources)
low confidence at research time
- blm.gov/announcement/blm-seeks-input-proposed-lucky-star-transmission-line
- cowboystatedaily.com/2024/02/26/wyoming-to-see-billions-of-dollars-in-wind-projects-built-in-next-few-years/
Commercial operation date: The only COD tied to this queue entry is LBNL's 2028-07-11. The news-extracted 2026 target comes from a single Cowboy State Daily article about the 'Chokecherry and Sierra Madre' project, which may be a different project from the 500 MW Lucky Star Wind entry. No second post-LBNL source corroborates it, and no live search results were returned.
Developer: The LBNL filer 'Lucky Star Wind, LLC' is consistent with the BLM-named applicant 'Lucky Star, LLC' on the Lucky Star transmission line notice. No parent or operating company was identified in the sources provided, so no shell-to-parent mapping can be made.
Status: LBNL lists status 'active' with ia_status 'IA Executed' and is_operational false. The BLM transmission-line notice is consistent with a project still in development. Nothing indicates construction has started on this specific queue entry.
About
Generated Apr 10, 2026
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
PacifiCorp-C1-35 is a proposed 500 MW wind generation project located in Carbon County, Wyoming. The developer is Lucky Star Wind, LLC, and the project is interconnected with PacifiCorp via the Aeolus substation. The project entered the PacifiCorp interconnection queue on May 13, 2021, with a proposed commercial operation date of December 31, 2024. The interconnection agreement has been executed.
The development project consists of 500 MW of wind capacity. It has been featured in recent news coverage related to industry and regulatory matters.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- LBNL queue source as of: Dec 31, 2025.
Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
WY
County
Carbon
Grid Region
Mountain West
Market
—
Developer
Lucky Star Wind, LLC
Utility
PacifiCorp
Entity
PacifiCorp
Service Type
ERIS
Point of Interconnection
Aeolus substation
Data Source
LBNL
Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- MOUNTAIN_WEST
- Trading Hub
- FOURCORNERS
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Last updated 2026-03-31
View all articlesMax 4 Wind
Data tables and metrics from the InfraSure database.
FPL Energy Oliver Wind II LLC
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Wind queue pipeline overview
Summary analysis with parallel narrative sections and visualizations.
FPL Energy Oliver Wind I LLC
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.