Project PacifiCorp-836 — Project Summary

Queue ID
PacifiCorp-836
Capacity
400 MW
Technology
Wind
Status
active
Location
Carbon, WY
Region
West
Developer
PacifiCorp
IA Status
IA Executed

PacifiCorp-836

PacifiCorp-836BetaActiveWindPacifiCorpLBNL

400 MW generation in Carbon, WY · In queue since December 2016 · Proposed COD December 2027

BA: PACENERC: WECCRC: SPPW

400 MW

Capacity

1

Components

Wind

9y 11m

In Queue

IA Executed

IA Phase

Signed Mar 2020

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

3y 3m

IA → COD

7y 9m

Total Duration

3y 3m

Construction75%
Queue EntryDec 5, 2016

Interconnection request submitted to ISO/RTO

Interconnection Study

Project undergoes interconnection studies to assess grid impact.

Typical: 18–36 months

Interconnection AgreementMar 25, 2020

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Project under construction

Typical: 18–36 months

Commercial Operation

Proposed COD: 2027-12-15

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Dec 15, 2027
From queue filing
Developer in saved assessment
PacifiCorp
From queue filing
Status at research time
Active
Active in queue with an executed IA (2020-03-25); no external information on construction or permitting progress.
Financing
Not recorded

Milestones in this assessment

IA executedMar 25, 2020Latest in this assessment

Interconnection agreement executed per LBNL queue data.

LBNL queue snapshot (PacifiCorp-836)
Research sources and reasoning (0 recorded sources)

low confidence at research time

No source list recorded with this assessment.

Commercial operation date: Only the LBNL snapshot is available, with proposed_cod 2027-12-15. No news or search findings exist to confirm or contradict it.

Developer: LBNL lists PacifiCorp as the developer, which is the utility itself rather than a shell LLC. No external sources were available to verify or identify a different operating company.

Status: LBNL reports status active and IA Executed, and no contrary evidence exists. The project is not operational per LBNL.

About

Saved background

Generated Apr 10, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

PacifiCorp-836 is a proposed 400 MW wind generation project located in Carbon County, Wyoming. The development project, sponsored by PacifiCorp, consists of 400 MW of wind capacity. It is actively listed in the PacifiCorp interconnection queue, with an original queue entry date of December 5, 2016. The proposed commercial operation date is October 1, 2023, and the Interconnection Agreement (IA) has been executed.

The point of interconnection for the project is the Aeolus substation. The project has appeared in recent news coverage regarding PacifiCorp's generation development plans in the West region.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • LBNL queue source as of: Dec 31, 2025.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

WY

County

Carbon

Grid Region

Mountain West

Market

—

Developer

PacifiCorp

Utility

PacifiCorp

Entity

PacifiCorp

Service Type

ERIS

Point of Interconnection

Aeolus substation

Data Source

LBNL

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
MOUNTAIN_WEST
Trading Hub
FOURCORNERS
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.