KCE NY 31
50 MW storage in Suffolk, NY · In queue since September 2026
50 MW
Capacity
0
Components
1 month
In Queue
—
IA Status
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
1 month
Interconnection request submitted to ISO/RTO
NYISO transitioned to a Transitional Cluster Study (TCS) format in 2024.
Typical: >42 months (historical); ~24 months target
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Commercial operation date not yet determined
KCE NY 31 is a proposed 50 MW battery energy storage development project located in Suffolk County, New York. The project is being developed by KCE NY 31, LLC, and is classified as a standalone storage (ES) facility. It is proposed to interconnect to the transmission system at the Shoreham 138 kV point of interconnection, within the service territory of transmission owner LIPA (Long Island Power Authority).
The project is listed in the New York Independent System Operator (NYISO) interconnection queue under queue ID NYISO-C26-0063, with a queue entry date of September 14, 2026. As of the latest available data, its queue status is active. The available records do not specify a proposed commercial operation date or the status of an interconnection agreement for the project.
Generated from interconnection queue and public data sources
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
NY
County
Suffolk
Grid Region
NYISO (New York)
Market
ISO/RTO Member
Developer
KCE NY 31, LLC
Utility
Transmission Owner LIPA Transmission Owner NaN Name: 247, dtype: object
Entity
NYISO
Service Type
—
Point of Interconnection
Shoreham 138kV
Data Source
Live · NYISO
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- NYISO
- Trading Hub
- ZONE K
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.