Roseton Energy Storage (NYISO-C26-0055) — Project Summary

Queue ID
NYISO-C26-0055
Capacity
330 MW
Technology
Battery
Status
active
Location
Orange County, NY
Region
NYISO
Developer
Roseton Energy Storage LLC
IA Status
—

Roseton Energy Storage

NYISO-C26-0055BetaActiveESNYISOLive · NYISO

330 MW storage in Orange County, NY · In queue since September 2026

BA: NYISISO/RTO: NYISONERC: NPCCRC: NYIS

330 MW

Capacity

0

Components

1 month

In Queue

—

IA Status

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

1 month

Pre-Study0%
Queue EntrySep 10, 2026

Interconnection request submitted to ISO/RTO

TCS Study

NYISO transitioned to a Transitional Cluster Study (TCS) format in 2024.

Typical: >42 months (historical); ~24 months target

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Commercial operation date not yet determined

Cross-source intelligence
Beta
Low confidence·4 sources·as of 2026-10-25
Expected COD
Oct 2029
Developer
Roseton Energy Storage LLC
From queue filing
Status
Active
Active — new 2026 NYISO queue entry (C26); the project LLC qualified to do business in NY in Aug 2026, with no public permitting, IA or construction news yet.
Financing
Unannounced
About

Roseton Energy Storage (queue ID NYISO-C26-0055) is a proposed 330 MW battery energy storage development project in Orange County, New York. The project is being developed by Roseton Energy Storage LLC and would use energy storage (ES) technology. It is planned to connect to the grid at the 345 kV Roseton Substation, in a transmission area where CHG&E is listed as the transmission owner.

The project is in the interconnection queue of the New York Independent System Operator (NYISO), with a queue entry date of September 10, 2026. Its status in the queue is listed as active. The available data does not specify a proposed commercial operation date or the status of an interconnection agreement.

Generated from interconnection queue and public data sources

Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

NY

County

Orange County

Grid Region

NYISO (New York)

Market

ISO/RTO Member

Developer

Roseton Energy Storage LLC

Utility

Transmission Owner CHG&E Transmission Owner NaN Name: 244, dtype: object

Entity

NYISO

Service Type

—

Point of Interconnection

345 kV Roseton Substation

Data Source

Live · NYISO

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
NYISO
Trading Hub
ZONE F
Hub Confidence
HIGH
Nearest Node (Estimated)
ROSETON___1
POI Substation
Roseton Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.

No Ask reports yet for this entity.

Ask about Roseton Energy Storage
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.