Gowanus Gas Turbine Facility Repowering (NYISO-C26-0051) — Project Summary

Queue ID
NYISO-C26-0051
Capacity
514.8 MW
Technology
Other
Status
active
Location
Kings County, Brooklyn, NY
Region
NYISO
Developer
Astoria Generating Company, LP
IA Status
—

Gowanus Gas Turbine Facility Repowering

NYISO-C26-0051BetaActiveCTNYISOLive · NYISO

514.8 MW generation in Kings County, Brooklyn, NY · In queue since September 2026

BA: NYISISO/RTO: NYISONERC: NPCCRC: NYIS

514.8 MW

Capacity

0

Components

1 month

In Queue

—

IA Status

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

1 month

Pre-Study0%
Queue EntrySep 4, 2026

Interconnection request submitted to ISO/RTO

TCS Study

NYISO transitioned to a Transitional Cluster Study (TCS) format in 2024.

Typical: >42 months (historical); ~24 months target

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Commercial operation date not yet determined

Cross-source intelligence
Beta
Low confidence·4 sources·as of 2026-10-25
Expected COD
—
Developer
AlphaGen
Filed as Astoria Generating Company, LP
Status
Active
Active in the NYISO queue (C26-0051, about 448-515 MW depending on source). It is a new filing following the earlier Gowanus repowering queue entry (0778), which is listed as withdrawn. The earlier Eastern Generation application was scrapped around 2021.
Financing
Unannounced
About

The Gowanus Gas Turbine Facility Repowering is a proposed generation development project in Kings County (Brooklyn), New York. Developed by Astoria Generating Company, LP, the project has a total capacity of 514.8 MW. It is classified under the "Other" technology category, with combustion turbine (CT) technology listed in its technical details. As its name indicates, the project involves repowering the existing Gowanus gas turbine facility.

The project is in the New York Independent System Operator (NYISO) interconnection queue under queue ID NYISO-C26-0051, with a queue entry date of September 4, 2026, and its status is listed as active. Consolidated Edison (CONED) is the transmission owner. The project would interconnect at an existing point of interconnection at the Gowanus 138 kV substation, between breakers 2N and 4N (circuits 42421 and 42423 to 42G13) and between breakers 2S and 5S (circuits 42422 and 42424 to 42G24). The available data does not include a proposed commercial operation date or the status of an interconnection agreement.

Generated from interconnection queue and public data sources

Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

NY

County

Kings County, Brooklyn

Grid Region

NYISO (New York)

Market

ISO/RTO Member

Developer

Astoria Generating Company, LP

Utility

Transmission Owner CONED Transmission Owner NaN Name: 240, dtype: object

Entity

NYISO

Service Type

—

Point of Interconnection

Existing POI at Gowanus 138 kV, between brk # 2N and brk # 4N (42421 & 42423 to 42G13) and between brk # 2S and brk # 5S (42422 & 42424 to 42G24).

Data Source

Live · NYISO

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
NYISO
Trading Hub
ZONE F
Hub Confidence
MEDIUM

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.

No Ask reports yet for this entity.

Ask about Gowanus Gas Turbine Facility Repowering
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.