Patriot Forge Energy Center (NYISO-C26-0029-2) — Project Summary

Queue ID
NYISO-C26-0029-2
Capacity
350 MW
Technology
Gas
Status
active
Location
Tioga County, PA
Region
NYISO
Developer
Patriot Forge PA, LLC
IA Status
—

Patriot Forge Energy Center

NYISO-C26-0029-2BetaActiveNGNYISOLive · NYISO

350 MW generation in Tioga County, PA · In queue since August 2026

BA: PJMISO/RTO: NYISONERC: RFCRC: PJM

350 MW

Capacity

0

Components

2 months

In Queue

—

IA Status

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

2 months

Pre-Study0%
Queue EntryAug 25, 2026

Interconnection request submitted to ISO/RTO

TCS Study

NYISO transitioned to a Transitional Cluster Study (TCS) format in 2024.

Typical: >42 months (historical); ~24 months target

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Commercial operation date not yet determined

Cross-source intelligence
Beta
Low confidence·1 sources·as of 2026-10-25
Expected COD
—
Developer
Patriot Forge PA, LLC
From queue filing
Status
Active
Active in the NYISO queue (queue date 2026-08-25). The Grid Status listing confirms a 350 MW gas turbine project, but there is no public evidence of an IA, permits, or construction. Note that LBNL lists the state as PA (Tioga County) while the queue is NYISO, which is worth verifying.
Financing
Unannounced
About

The Patriot Forge Energy Center is a proposed 350 MW natural gas-fired generation project located in Tioga County, Pennsylvania. The development project is being advanced by Patriot Forge PA, LLC and is listed in the New York Independent System Operator (NYISO) interconnection queue under queue ID NYISO-C26-0029-2, despite its location in Pennsylvania. The project is designated as a generation-only facility, with natural gas (NG) identified as its fuel type.

The project entered the NYISO queue on August 25, 2026, and holds an active status. Its proposed point of interconnection is the Mainesburg to Homer City 345 kV Line 47, with New York State Electric & Gas (NYSEG) listed as the transmission owner. The available queue data does not specify a proposed commercial operation date or the status of an interconnection agreement.

Generated from interconnection queue and public data sources

Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

PA

County

Tioga County

Grid Region

NYISO (New York)

Market

ISO/RTO Member

Developer

Patriot Forge PA, LLC

Utility

Transmission Owner NYSEG Transmission Owner NaN Name: 227, dtype: object

Entity

NYISO

Service Type

—

Point of Interconnection

Mainesburg to Homer City 345 kV Line 47

Data Source

Live · NYISO

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
NYISO
Trading Hub
ZONE F
Hub Confidence
MEDIUM

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.

No Ask reports yet for this entity.

Ask about Patriot Forge Energy Center
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.