Fort Edward Solar Farm (NY53)
100 MW generation in Washington, NY · In queue since August 2026
100 MW
Capacity
0
Components
2 months
In Queue
—
IA Status
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
2 months
Interconnection request submitted to ISO/RTO
NYISO transitioned to a Transitional Cluster Study (TCS) format in 2024.
Typical: >42 months (historical); ~24 months target
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Commercial operation date not yet determined
Fort Edward Solar Farm (NY53) is a proposed 100 MW solar generation project in Washington County, New York. It is being developed by Fort Edward Solar LLC and is listed under queue ID NYISO-C26-0026. The project would connect to the grid at the Mohican to Battenkill 115 kV Line #15, and the transmission owner is listed as NM-NG.
The project is in the New York Independent System Operator (NYISO) interconnection queue, where it holds active status. Its queue entry date is August 17, 2026. The available queue data does not specify a proposed commercial operation date or the status of an interconnection agreement.
Generated from interconnection queue and public data sources
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
NY
County
Washington
Grid Region
NYISO (New York)
Market
ISO/RTO Member
Developer
Fort Edward Solar LLC
Utility
Transmission Owner NM-NG Transmission Owner NaN Name: 224, dtype: object
Entity
NYISO
Service Type
—
Point of Interconnection
Mohican to Battenkill 115 kV Line #15
Data Source
Live · NYISO
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- NYISO
- Trading Hub
- ZONE F
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No Ask reports yet for this entity.
Ask about Fort Edward Solar Farm (NY53)Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.