Clay Energy Storage 1
250 MW storage in Onondaga, NY · In queue since August 2026
250 MW
Capacity
0
Components
2 months
In Queue
—
IA Status
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
2 months
Interconnection request submitted to ISO/RTO
NYISO transitioned to a Transitional Cluster Study (TCS) format in 2024.
Typical: >42 months (historical); ~24 months target
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Commercial operation date not yet determined
Clay Energy Storage 1 is a proposed 250 MW battery energy storage development project in Onondaga County, New York. The project is being developed by Terra-Gen Development Company, LLC, and is classified as a standalone storage project using energy storage (ES) technology. It is proposed to interconnect to the transmission system at the Clay 345 kV Substation, in the service territory of transmission owner NM-NG.
The project is listed in the New York Independent System Operator (NYISO) interconnection queue under queue ID NYISO-C26-0022, with a queue entry date of August 13, 2026. Its status in the queue is active. The available queue data does not include a proposed commercial operation date or the status of an interconnection agreement.
Generated from interconnection queue and public data sources
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
NY
County
Onondaga
Grid Region
NYISO (New York)
Market
ISO/RTO Member
Developer
Terra-Gen Development Company, LLC
Utility
Transmission Owner NM-NG Transmission Owner NaN Name: 220, dtype: object
Entity
NYISO
Service Type
—
Point of Interconnection
Clay 345 kV Substation
Data Source
Live · NYISO
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- NYISO
- Trading Hub
- ZONE C
- Hub Confidence
- HIGH
- POI Substation
- Clay Lick Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No Ask reports yet for this entity.
Ask about Clay Energy Storage 1Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.