Alcazar 4
79 MW storage in Dutchess, NY · In queue since July 2026
79 MW
Capacity
0
Components
3 months
In Queue
—
IA Status
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
3 months
Interconnection request submitted to ISO/RTO
NYISO transitioned to a Transitional Cluster Study (TCS) format in 2024.
Typical: >42 months (historical); ~24 months target
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Commercial operation date not yet determined
Alcazar 4 (queue ID NYISO-C26-0010) is a proposed battery energy storage development project located in Dutchess County, New York. Terra-Gen Development Company, LLC is developing the project, which has a total proposed capacity of 79 MW. It is classified as a standalone storage project, with energy storage (ES) as its sole technology component.
The project is listed as active in the interconnection queue administered by the New York Independent System Operator (NYISO), with a queue entry date of July 31, 2026. The proposed point of interconnection is the Hurley Avenue 115 kV Substation, and the transmission owner is identified as CHG&E. The available data does not specify a proposed commercial operation date or the status of an interconnection agreement.
Generated from interconnection queue and public data sources
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
NY
County
Dutchess
Grid Region
NYISO (New York)
Market
ISO/RTO Member
Developer
Terra-Gen Development Company, LLC
Utility
Transmission Owner CHG&E Transmission Owner NaN Name: 211, dtype: object
Entity
NYISO
Service Type
—
Point of Interconnection
Hurley Avenue 115 kV Substation
Data Source
Live · NYISO
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- NYISO
- Trading Hub
- ZONE G
- Hub Confidence
- HIGH
- POI Substation
- Hurley Avenue Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.