EVERGREEN RIDGE POWER (NYISO-C26-0001-1) — Project Summary

Queue ID
NYISO-C26-0001-1
Capacity
641 MW
Technology
Other
Status
active
Location
TIOGA, PA
Region
NYISO
Developer
Evergreen Ridge Power, LLC
IA Status
—

EVERGREEN RIDGE POWER

NYISO-C26-0001-1BetaActiveCCNYISOLive · NYISO

641 MW generation in TIOGA, PA · In queue since July 2026

BA: PJMISO/RTO: NYISONERC: RFCRC: PJM

641 MW

Capacity

0

Components

3 months

In Queue

—

IA Status

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

3 months

Pre-Study0%
Queue EntryJul 31, 2026

Interconnection request submitted to ISO/RTO

TCS Study

NYISO transitioned to a Transitional Cluster Study (TCS) format in 2024.

Typical: >42 months (historical); ~24 months target

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Commercial operation date not yet determined

Cross-source intelligence
Beta
Low confidence·5 sources·as of 2026-10-25
Expected COD
—
Developer
Evergreen Ridge Power, LLC
From queue filing
Status
Active
Active in NYISO queue (C26-0001), a ~624-641 MW gas combined-cycle project in Tioga County, PA. Queue entry dated 2026-07 and no public development milestones found.
Financing
Unannounced
About

Evergreen Ridge Power is a proposed 641 MW generation development project located in Tioga County, Pennsylvania. The project is being developed by Evergreen Ridge Power, LLC, and is classified under the "Other" technology category, with a technology detail designation of combined cycle (CC). Although sited in Pennsylvania, the project has entered the interconnection queue of the New York Independent System Operator (NYISO), with New York State Electric & Gas (NYSEG) listed as the transmission owner.

The project holds queue ID NYISO-C26-0001-1 and entered the NYISO interconnection queue on July 31, 2026. Its queue status is active. The proposed point of interconnection is the Mainesburg 345 kV to Homer City 345 kV transmission circuit. The available data does not specify a proposed commercial operation date or the status of an interconnection agreement.

Generated from interconnection queue and public data sources

Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

PA

County

TIOGA

Grid Region

NYISO (New York)

Market

ISO/RTO Member

Developer

Evergreen Ridge Power, LLC

Utility

Transmission Owner NYSEG Transmission Owner NaN Name: 202, dtype: object

Entity

NYISO

Service Type

—

Point of Interconnection

Mainesburg 345 kV to Homer City 345 kV Circuit ID -1

Data Source

Live · NYISO

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
NYISO
Trading Hub
ZONE C
Hub Confidence
MEDIUM

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.

No Ask reports yet for this entity.

Ask about EVERGREEN RIDGE POWER
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.