Town Line Solar CSR Phase I (NYISO-C24-363) — Project Summary

Queue ID
NYISO-C24-363
Capacity
240 MW
Technology
Solar+Battery
Status
active
Location
Sullivan, NY
Region
NYISO
Developer
RWE Solar Development, LLC
IA Status
—

Town Line Solar CSR Phase I

NYISO-C24-363BetaActiveSolarBatteryNYISOLBNL + Live

240 MW hybrid in Sullivan, NY · In queue since October 2024 · Proposed COD May 2030

BA: NYISISO/RTO: NYISONERC: NPCCRC: NYIS

240 MW

Capacity

1

Components

Solar

2y 1m

In Queue

—

IA Status

COD target: 2030

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

5y 7m

Study Phase

C24

Pre-Study0%
Queue EntryOct 15, 2024

Interconnection request submitted to ISO/RTO

TCS Study

NYISO transitioned to a Transitional Cluster Study (TCS) format in 2024.

Typical: >42 months (historical); ~24 months target

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2030-05-01

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Sep 30, 2026 queue source. See the queue record for reported project facts.

Research COD
May 1, 2030
From queue filing
Developer in saved assessment
RWE
Filed as RWE Solar Development, LLC
Status at research time
Active
Active — early-stage queue entry (Oct 2024), no construction or permitting milestones publicly announced yet
Financing
Not recorded

Milestones in this assessment

IA executedOct 15, 2024Latest in this assessment

NYISO interconnection queue application submitted

Research sources and reasoning (0 recorded sources)

low confidence at research time

No source list recorded with this assessment.

Commercial operation date: Only LBNL queue filing provides a COD target of May 2030. No independent news or press releases found to validate or update this date.

Developer: LBNL filing entity 'RWE Solar Development, LLC' is the project development subsidiary of RWE, a major German utility and renewable energy operator. This is a standard parent-subsidiary structure rather than a shell LLC.

Status: LBNL status is 'active' with recent queue entry date (Oct 2024). No news coverage found to indicate progression beyond initial interconnection application stage.

About

Saved background

Generated Apr 10, 2026 · Predates Sep 30, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Town Line Solar CSR Phase I project is a proposed 240 MW solar and battery hybrid project located in Sullivan County, New York. Developed by RWE Solar Development, LLC, the project consists of 240 MW of solar generation. It is interconnected to the NYISO queue under queue ID NYISO-C24-363, with an entry date of October 15, 2024, and a proposed commercial operation date of December 1, 2027.

The project is slated to connect to the Coopers Corner to Middletown Tap 345 kV Line. The designated utility is NYPA, and the project is currently listed as active within the NYISO interconnection queue. The project has appeared in recent news coverage.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • NYISO queue source as of: Sep 30, 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

NY

County

Sullivan

Grid Region

NYISO (New York)

Market

ISO/RTO Member

Developer

RWE Solar Development, LLC

Utility

NYPA

Entity

NYISO

Service Type

—

Point of Interconnection

Coopers Corner to Middletown Tap 345 kV Line

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
NYISO
Trading Hub
ZONE G
Hub Confidence
HIGH
Nearest Node (Estimated)
SHOEMAKER___GT
POI Substation
Middletown Tap

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform