Sugar Loaf Energy Storage I (NYISO-C24-358) — Project Summary

Queue ID
NYISO-C24-358
Capacity
300 MW
Technology
Battery
Status
active
Location
Orange, NY
Region
NYISO
Developer
Hambletonian Energy Storage LLC
IA Status
—

Sugar Loaf Energy Storage I

NYISO-C24-358BetaActiveBatteryNYISOLBNL + Live

300 MW storage in Orange, NY · In queue since October 2024 · Proposed COD December 2029

BA: NYISISO/RTO: NYISONERC: NPCCRC: NYIS

300 MW

Capacity

1

Components

Battery

2y 1m

In Queue

—

IA Status

COD target: 2029

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

5y 2m

Study Phase

C24

Pre-Study0%
Queue EntryOct 15, 2024

Interconnection request submitted to ISO/RTO

TCS Study

NYISO transitioned to a Transitional Cluster Study (TCS) format in 2024.

Typical: >42 months (historical); ~24 months target

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-12-01

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Sep 30, 2026 queue source. See the queue record for reported project facts.

Research COD
Dec 1, 2029
From queue filing
Developer in saved assessment
Hambletonian Energy Storage LLC
From queue filing
Status at research time
Active
Active — recently entered queue (Oct 2024), early-stage interconnection study phase
Financing
Not recorded

Milestones in this assessment

IA executedOct 2024Latest in this assessment

Entered NYISO interconnection queue as C24-358

Research sources and reasoning (0 recorded sources)

low confidence at research time

No source list recorded with this assessment.

Commercial operation date: Only LBNL queue data available with proposed COD of December 2029. No independent news or press releases found to validate or contradict this target date.

Developer: Only LBNL filing entity 'Hambletonian Energy Storage LLC' is available. No news coverage found to identify a parent operating company or confirm if this is a project-specific LLC versus an established developer.

Status: LBNL shows Active status with queue entry in October 2024. No news coverage or milestones found to indicate progression beyond initial filing stage.

About

Saved background

Generated Apr 10, 2026 · Predates Sep 30, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Sugar Loaf Energy Storage I project is a proposed 300 MW battery storage development in Orange County, New York. The project, being developed by CEDAR HOLDCO LLC, is located within the NYISO region and will interconnect to the Orange and Rockland (O&R) utility grid at the Sugarloaf 138 kV Substation. It entered the NYISO interconnection queue as queue ID NYISO-C24-358 on October 15, 2024, with a proposed commercial operation date of December 1, 2029.

The project consists entirely of battery storage, with a total capacity of 300 MW. The Sugar Loaf Energy Storage I project has appeared in recent news coverage regarding energy storage projects in the state.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • NYISO queue source as of: Sep 30, 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

NY

County

Orange

Grid Region

NYISO (New York)

Market

ISO/RTO Member

Developer

Hambletonian Energy Storage LLC

Utility

O&R

Entity

NYISO

Service Type

—

Point of Interconnection

Sugarloaf 138 kV Substation

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
NYISO
Trading Hub
ZONE G
Hub Confidence
HIGH
Nearest Node (Estimated)
SUGRLOAF_69_KV_LOAD_REV_LBMP_G
POI Substation
Sugarloaf Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.