Jericho Solar (NYISO-C24-321) — Project Summary

Queue ID
NYISO-C24-321
Capacity
100 MW
Technology
Solar
Status
withdrawn
Location
Franklin, NY
Region
NYISO
Developer
Jericho Solar Park LLC
IA Status
—

Jericho Solar

NYISO-C24-321BetaWithdrawnSolarNYISOLBNL + Live

100 MW generation in Franklin, NY · In queue since October 2024 · Proposed COD October 2029

Withdrawn from the NYISO queue, according to NYISO's queue (Sep 2026).

BA: NYISISO/RTO: NYISONERC: NPCCRC: NYIS

100 MW

Capacity

1

Components

Solar

2y 1m

In Queue

—

IA Status

COD target: 2029

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

5 years

Study Phase

C24

Queue EntryOct 7, 2024

Interconnection request submitted to ISO/RTO

Commercial Operation

Proposed COD: 2029-10-01

WithdrawnWithdrawn

Project withdrew from interconnection queue

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Sep 30, 2026 queue source. See the queue record for reported project facts.

Research COD
Oct 1, 2029
From queue filing
Developer in saved assessment
Jericho Solar Park LLC
From queue filing
Status at research time
Active
Active — recently entered NYISO queue (October 2024), early-stage development with no public milestones announced
Financing
Not recorded

Milestones in this assessment

IA executedOct 7, 2024Latest in this assessment

Project entered NYISO interconnection queue

Research sources and reasoning (0 recorded sources)

low confidence at research time

No source list recorded with this assessment.

Commercial operation date: Only LBNL queue data available with proposed COD of October 2029. No independent news or press releases found to validate or contradict this target date.

Developer: Only LBNL filing entity available. No press releases or corporate announcements found to identify a parent operating company distinct from the project LLC.

Status: LBNL shows active queue status as of October 2024. No news coverage found to indicate construction activity, permitting progress, or status changes.

About

Saved background

Generated Apr 10, 2026 · Predates Sep 30, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Jericho Solar project is a proposed 100 MW solar generation project located in Franklin County, New York. The developer is Jericho Solar Park LLC. It is interconnected to NYPA's Willis Sub at 115kV.

The project is listed in the NYISO interconnection queue as entry NYISO-C24-321, with a queue entry date of October 7, 2024, and a proposed commercial operation date of October 1, 2029. The project is currently listed as active in the interconnection queue. The utility is NYPA.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • NYISO queue source as of: Sep 30, 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

NY

County

Franklin

Grid Region

NYISO (New York)

Market

ISO/RTO Member

Developer

Jericho Solar Park LLC

Utility

NYPA

Entity

NYISO

Service Type

—

Point of Interconnection

NYPA's Willis Sub @115kV

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
NYISO
Trading Hub
ZONE D
Hub Confidence
HIGH
POI Substation
Sub

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.