Kimberlite Solar (NYISO-C24-300) — Project Summary

Queue ID
NYISO-C24-300
Capacity
175 MW
Technology
Solar
Status
active
Location
Clearfield, PA
Region
NYISO
Developer
Kimberlite Solar Power, LLC
IA Status
—

Kimberlite Solar

NYISO-C24-300BetaActiveSolarNYISOLBNL + Live

175 MW generation in Clearfield, PA · In queue since September 2024 · Proposed COD March 2029

BA: PJMISO/RTO: NYISONERC: RFCRC: PJM

175 MW

Capacity

1

Components

Solar

2y 2m

In Queue

—

IA Status

COD target: 2029

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

4y 6m

Study Phase

C24

Pre-Study0%
Queue EntrySep 30, 2024

Interconnection request submitted to ISO/RTO

TCS Study

NYISO transitioned to a Transitional Cluster Study (TCS) format in 2024.

Typical: >42 months (historical); ~24 months target

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-03-01

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Sep 30, 2026 queue source. See the queue record for reported project facts.

Research COD
Mar 1, 2029
From queue filing
Developer in saved assessment
Kimberlite Solar Power, LLC
From queue filing
Status at research time
Active
Active — recently entered NYISO queue (Sept 2024), no public announcements on permitting or construction timeline
Financing
Not recorded

Milestones in this assessment

IA executedSep 30, 2024Latest in this assessment

Entered NYISO interconnection queue

Research sources and reasoning (0 recorded sources)

low confidence at research time

No source list recorded with this assessment.

Commercial operation date: Only LBNL queue data available with proposed COD of March 2029. No independent news or press releases found to validate or contradict this target date.

Developer: Only LBNL filing entity available. No news coverage found to identify whether this is a project LLC for a larger parent company or an independent developer.

Status: LBNL shows active queue status as of September 2024. No news coverage found to provide additional detail on project advancement or milestones.

About

Saved background

Generated Apr 10, 2026 · Predates Sep 30, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Kimberlite Solar is a proposed solar generation project with a total capacity of 175 MW, located in Clearfield County, Pennsylvania. The project, developed by Kimberlite Solar Power, LLC, is in the New York Independent System Operator (NYISO) interconnection queue under queue ID NYISO-C24-300. The project's queue entry date is September 30, 2024, with a proposed commercial operation date of March 1, 2029. The point of interconnection is the Homer City - Mainesburg 345kV Line (L47) and the interconnecting utility is NYSEG.

The Kimberlite Solar project is currently listed as "active" in the NYISO interconnection queue. Recent news coverage has discussed the project's progress and potential impact on the regional energy market.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • NYISO queue source as of: Sep 30, 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

PA

County

Clearfield

Grid Region

NYISO (New York)

Market

ISO/RTO Member

Developer

Kimberlite Solar Power, LLC

Utility

NYSEG

Entity

NYISO

Service Type

—

Point of Interconnection

Homer City - Mainesburg 345kV Line (L47)

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
NYISO
Trading Hub
ZONE F
Hub Confidence
MEDIUM

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.