Cohocton (NYISO-C24-224) — Project Summary

Queue ID
NYISO-C24-224
Capacity
130 MW
Technology
Solar+Battery
Status
active
Location
Steuben, NY
Region
NYISO
Developer
ACE DevCo NC, LLC
IA Status
—

Cohocton

NYISO-C24-224BetaActiveSolarBatteryNYISOLBNL + Live

130 MW hybrid in Steuben, NY · In queue since September 2024 · Proposed COD October 2029

BA: NYISISO/RTO: NYISONERC: NPCCRC: NYIS

130 MW

Capacity

1

Components

Solar

2y 2m

In Queue

—

IA Status

COD target: 2029

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

5y 1m

Study Phase

C24

Pre-Study0%
Queue EntrySep 20, 2024

Interconnection request submitted to ISO/RTO

TCS Study

NYISO transitioned to a Transitional Cluster Study (TCS) format in 2024.

Typical: >42 months (historical); ~24 months target

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-10-01

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Sep 30, 2026 queue source. See the queue record for reported project facts.

Research COD
Oct 1, 2029
From queue filing
Developer in saved assessment
ACE DevCo NC, LLC
From queue filing
Status at research time
Active
Active — recently entered NYISO queue (September 2024), early-stage interconnection study phase
Financing
Not recorded

Milestones in this assessment

IA executedSep 20, 2024Latest in this assessment

Project entered NYISO interconnection queue

Research sources and reasoning (0 recorded sources)

low confidence at research time

No source list recorded with this assessment.

Commercial operation date: Only LBNL queue data available with proposed COD of October 2029. No independent news or press releases found to validate or contradict this target date.

Developer: Only LBNL filing entity 'ACE DevCo NC, LLC' is available. No press releases or corporate announcements found to identify a parent operating company or confirm if this is a project-specific LLC.

Status: LBNL shows active queue status as of September 2024. No news coverage found indicating construction activity, permitting milestones, or status changes.

About

Saved background

Generated Apr 10, 2026 · Predates Sep 30, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The proposed Cohocton project is a 130 MW hybrid solar and battery energy storage development in Steuben County, New York. The project, developed by ACE DevCo NC, LLC, consists of 130 MW of solar photovoltaic generation. It is interconnected to the New York Independent System Operator (NYISO) grid at the Tap 115kV line from Bath 115 kV station to Spencer Hill (Howard) 115 kV Station.

The project is listed in the NYISO interconnection queue as entry NYISO-C24-224, with a queue entry date of September 20, 2024, and a proposed commercial operation date of October 1, 2029. The project's interconnection status is currently active. Recent news coverage has discussed the project's potential impact on the local energy landscape.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • NYISO queue source as of: Sep 30, 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

NY

County

Steuben

Grid Region

NYISO (New York)

Market

ISO/RTO Member

Developer

ACE DevCo NC, LLC

Utility

NYSEG

Entity

NYISO

Service Type

—

Point of Interconnection

Bath - Spencer Hill (Howard) 115 kV

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
NYISO
Trading Hub
ZONE B
Hub Confidence
HIGH
Nearest Node (Estimated)
STEUBEN_REC_LFGE
POI Substation
Bath

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.