Trelina Energy Storage
120 MW storage in Seneca, NY · In queue since September 2024 · Proposed COD December 2030
120 MW
Capacity
1
Components
Battery
2y 2m
In Queue
—
IA Status
COD target: 2030
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
6y 3m
Study Phase
C24
Interconnection request submitted to ISO/RTO
NYISO transitioned to a Transitional Cluster Study (TCS) format in 2024.
Typical: >42 months (historical); ~24 months target
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2030-12-01
Cross-source intelligence
Experimental assessment saved at the research date. Predates the Sep 30, 2026 queue source. See the queue record for reported project facts.
Milestones in this assessment
NYISO interconnection queue application submitted
Research sources and reasoning (0 recorded sources)
low confidence at research time
No source list recorded with this assessment.
Commercial operation date: Only LBNL queue data available with proposed COD of December 2030. No independent news or press releases found to validate or contradict this target date.
Developer: LBNL filing entity is 'NextEra Energy Resources Interconnection Holdings, LLC', a typical interconnection-holding subsidiary. Parent operating company is NextEra Energy Resources, the competitive renewables arm of NextEra Energy.
Status: LBNL status shows 'active' with recent queue entry date (Q3 2024). No news coverage found indicating any development activity beyond initial interconnection application.
About
Generated Apr 10, 2026 · Predates Sep 30, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The Trelina Energy Storage project is a proposed 120 MW battery storage project located in Seneca County, New York. It is being developed by NextEra Energy Resources Interconnection Holdings, LLC and is interconnected to the New York State Electric and Gas (NYSEG) utility. The project entered the New York Independent System Operator (NYISO) interconnection queue as queue ID NYISO-C24-207 on September 19, 2024, with a proposed commercial operation date of December 1, 2029.
The point of interconnection (POI) is the Planned Q720 Trelina Solar Switchyard on the Border City to Station 168 115 kV line. The project is currently listed as active in the NYISO interconnection queue. Recent news coverage has discussed the development.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- NYISO queue source as of: Sep 30, 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
NY
County
Seneca
Grid Region
NYISO (New York)
Market
ISO/RTO Member
Developer
NextEra Energy Resources Interconnection Holdings, LLC
Utility
NYSEG
Entity
NYISO
Service Type
—
Point of Interconnection
Border City to Station 168 115 kV
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- NYISO
- Trading Hub
- ZONE B
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- STA_168_34_KV_BK1_2_REV_LBMP_B
- POI Substation
- Station 168
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
KCE NY 2
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
KCE NY 31
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
A specific company (e.g., NextEra Energy, Duke Energy)
Data-driven briefing on NextEra Energy — fleet, generation, financial, and news signals.
NextEra Energy
Data-driven briefing on NextEra Energy — fleet, generation, financial, and news signals.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.