Wheelhouse Energy Storage (NYISO-C24-205) — Project Summary

Queue ID
NYISO-C24-205
Capacity
200 MW
Technology
Battery
Status
active
Location
Schoharie, NY
Region
NYISO
Developer
NEER Interconnection Holdings, LLC
IA Status

Wheelhouse Energy Storage

NYISO-C24-205BetaActiveBatteryNYISOLBNL + Live

200 MW storage in Schoharie, NY · In queue since September 2024 · Proposed COD December 2030

BA: NYISISO/RTO: NYISONERC: NPCCRC: NYIS

200 MW

Capacity

1

Components

Battery

1y 10m

In Queue

IA Status

COD target: 2030

Interconnection

Total Duration

6y 3m

Study Phase

C24

Pre-Study0%
Queue EntrySep 19, 2024

Interconnection request submitted to ISO/RTO

TCS Study

NYISO transitioned to a Transitional Cluster Study (TCS) format in 2024.

Typical: >42 months (historical); ~24 months target

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2030-12-01

Cross-source intelligence
Beta
Low confidence·0 sources·as of 2026-06-01
Expected COD
2030-12-01
From queue filing
Developer
NextEra Energy Resources
Filed as NEER Interconnection Holdings, LLC
Status
Active
Active — early-stage queue position filed September 2024, no public construction or permitting announcements yet
Financing
Unannounced
Key milestones
IA executedSep 2024Most recent

Entered NYISO interconnection queue as C24-205

About

Wheelhouse Energy Storage is a proposed 200 MW battery storage project located in Schoharie County, New York. The project, developed by NEER Interconnection Holdings, LLC, is interconnected to the NYISO grid at the Planned Wheelhouse Solar switchyard looping Edic -Princetown #2. It entered the NYISO interconnection queue as project C24-205 on September 19, 2024, with a proposed commercial operation date of December 1, 2029.

The project is currently listed as active in the interconnection queue. The designated utility is NYPA, and the interconnecting entity is NYISO. Recent news coverage has discussed the Wheelhouse Energy Storage development.

Generated from interconnection queue and public data sources

Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

NY

County

Schoharie

Grid Region

NYISO (New York)

Market

ISO/RTO Member

Developer

NEER Interconnection Holdings, LLC

Utility

NYPA

Entity

NYISO

Service Type

Point of Interconnection

Edic - Princetown Line #352

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
NYISO
Trading Hub
ZONE E
Hub Confidence
MEDIUM

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.

No Ask reports yet for this entity.

Ask about Wheelhouse Energy Storage
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.