North Country Wind
380 MW generation in Franklin, NY · In queue since September 2024 · Proposed COD June 2029
380 MW
Capacity
1
Components
Wind
2y 2m
In Queue
—
IA Status
COD target: 2029
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
4y 9m
Study Phase
C24
Interconnection request submitted to ISO/RTO
NYISO transitioned to a Transitional Cluster Study (TCS) format in 2024.
Typical: >42 months (historical); ~24 months target
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2029-06-01
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Research sources and reasoning (3 recorded sources)
medium confidence at research time
- terra-gen.com/terragen_project/north-country-wind/
- northcountrynywindproject.com/
- documents.dps.ny.gov/public/Common/ViewDoc.aspx?DocRefId=%7BB0B7119A-0000-CA15-B814-256A554F13E6%7D
Commercial operation date: No search result gives a COD or in-service target for North Country Wind. The Terra-Gen and DPS snippets describe a project under development or proposed, so the LBNL proposed COD of 2029-06-01 stands by default.
Developer: The Terra-Gen project page and the northcountrynywindproject.com snippet both say North Country Wind is under development by Terra-Gen. The LBNL filer 'NY North Country, LLC' looks like a project shell. The link between the two is inferred from the matching project name, county and capacity range, not from an explicit statement.
Status: The LBNL status is 'active'. The Terra-Gen page and the Dec 2025 DPS document both describe a proposed or under-development project, so there is no sign of withdrawal or construction.
About
Generated Apr 10, 2026 · Predates Sep 30, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The North Country Wind project is a proposed 380 MW wind generation facility located in Franklin County, New York. Developed by NY North Country, LLC, the project was entered into the NYISO interconnection queue (queue ID NYISO-C24-189) on September 18, 2024. The proposed commercial operation date is June 1, 2029. The point of interconnection is the Willis 230kV substation.
The project is currently listed as active in the NYISO queue. The designated utility for the project is NYPA. Recent news coverage has discussed the development project.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- NYISO queue source as of: Sep 30, 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
NY
County
Franklin
Grid Region
NYISO (New York)
Market
ISO/RTO Member
Developer
NY North Country, LLC
Utility
NYPA
Entity
NYISO
Service Type
—
Point of Interconnection
Willis 230kV substation
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- NYISO
- Trading Hub
- ZONE D
- Hub Confidence
- HIGH
- POI Substation
- Willis Road Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
KCE NY 2
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Max 4 Wind
Data tables and metrics from the InfraSure database.
KCE NY 31
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
FPL Energy Oliver Wind II LLC
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.