North Country Wind (NYISO-C24-189) — Project Summary

Queue ID
NYISO-C24-189
Capacity
380 MW
Technology
Wind
Status
active
Location
Franklin, NY
Region
NYISO
Developer
NY North Country, LLC
IA Status
—

North Country Wind

NYISO-C24-189BetaActiveWindNYISOLBNL + Live

380 MW generation in Franklin, NY · In queue since September 2024 · Proposed COD June 2029

BA: NYISISO/RTO: NYISONERC: NPCCRC: NYIS

380 MW

Capacity

1

Components

Wind

2y 2m

In Queue

—

IA Status

COD target: 2029

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

4y 9m

Study Phase

C24

Pre-Study0%
Queue EntrySep 18, 2024

Interconnection request submitted to ISO/RTO

TCS Study

NYISO transitioned to a Transitional Cluster Study (TCS) format in 2024.

Typical: >42 months (historical); ~24 months target

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-06-01

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Jun 1, 2029
From queue filing
Developer in saved assessment
Terra-Gen
Filed as NY North Country, LLC
Status at research time
Active
Active in the NYISO queue. Terra-Gen is developing the project, and a NY DPS (Article VII) filing dated Dec 2025 describes a 364.5 MW facility in Franklin and Clinton Counties. No construction start has been reported.
Financing
Not recorded
Research sources and reasoning (3 recorded sources)

medium confidence at research time

  1. terra-gen.com/terragen_project/north-country-wind/
  2. northcountrynywindproject.com/
  3. documents.dps.ny.gov/public/Common/ViewDoc.aspx?DocRefId=%7BB0B7119A-0000-CA15-B814-256A554F13E6%7D

Commercial operation date: No search result gives a COD or in-service target for North Country Wind. The Terra-Gen and DPS snippets describe a project under development or proposed, so the LBNL proposed COD of 2029-06-01 stands by default.

Developer: The Terra-Gen project page and the northcountrynywindproject.com snippet both say North Country Wind is under development by Terra-Gen. The LBNL filer 'NY North Country, LLC' looks like a project shell. The link between the two is inferred from the matching project name, county and capacity range, not from an explicit statement.

Status: The LBNL status is 'active'. The Terra-Gen page and the Dec 2025 DPS document both describe a proposed or under-development project, so there is no sign of withdrawal or construction.

About

Saved background

Generated Apr 10, 2026 · Predates Sep 30, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The North Country Wind project is a proposed 380 MW wind generation facility located in Franklin County, New York. Developed by NY North Country, LLC, the project was entered into the NYISO interconnection queue (queue ID NYISO-C24-189) on September 18, 2024. The proposed commercial operation date is June 1, 2029. The point of interconnection is the Willis 230kV substation.

The project is currently listed as active in the NYISO queue. The designated utility for the project is NYPA. Recent news coverage has discussed the development project.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • NYISO queue source as of: Sep 30, 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

NY

County

Franklin

Grid Region

NYISO (New York)

Market

ISO/RTO Member

Developer

NY North Country, LLC

Utility

NYPA

Entity

NYISO

Service Type

—

Point of Interconnection

Willis 230kV substation

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
NYISO
Trading Hub
ZONE D
Hub Confidence
HIGH
POI Substation
Willis Road Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.