KCE NY 38 (NYISO-C24-165) — Project Summary

Queue ID
NYISO-C24-165
Capacity
250 MW
Technology
Battery
Status
active
Location
Columbia, NY
Region
NYISO
Developer
KCE NY 38, LLC
IA Status
—

KCE NY 38

NYISO-C24-165BetaActiveBatteryNYISOLBNL + Live

250 MW storage in Columbia, NY · In queue since September 2024 · Proposed COD December 2029

BA: NYISISO/RTO: NYISONERC: NPCCRC: NYIS

250 MW

Capacity

1

Components

Battery

2y 2m

In Queue

—

IA Status

COD target: 2029

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

5y 3m

Study Phase

C24

Pre-Study0%
Queue EntrySep 16, 2024

Interconnection request submitted to ISO/RTO

TCS Study

NYISO transitioned to a Transitional Cluster Study (TCS) format in 2024.

Typical: >42 months (historical); ~24 months target

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-12-01

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Sep 30, 2026 queue source. See the queue record for reported project facts.

Research COD
Dec 1, 2029
From queue filing
Developer in saved assessment
KCE NY 38, LLC
From queue filing
Status at research time
Active
Active — early-stage queue entry from September 2024, no public construction or permitting activity identified
Financing
Not recorded

Milestones in this assessment

IA executedSep 16, 2024Latest in this assessment

Entered NYISO interconnection queue as C24-165

Research sources and reasoning (0 recorded sources)

low confidence at research time

No source list recorded with this assessment.

Commercial operation date: Only LBNL queue data available with proposed COD of December 2029. No independent news or press releases found to validate or contradict this target date.

Developer: Only the LBNL filing entity 'KCE NY 38, LLC' is available. No public information found identifying a parent operating company or developer behind this project-specific LLC.

Status: LBNL status shows Active with recent queue entry date. No news coverage or milestones found to indicate progression beyond initial interconnection application.

About

Saved background

Generated Apr 10, 2026 · Predates Sep 30, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

KCE NY 38 is a proposed 250 MW battery storage project located in Columbia County, New York. The project, developed by KCE NY 38, LLC, is slated to interconnect to the Churchtown 115 kV Substation. It is currently listed as active in the NYISO interconnection queue under queue ID NYISO-C24-165, with an entry date of September 16, 2024, and a proposed commercial operation date of January 1, 2029.

The project consists of 250 MW of battery storage capacity. The designated utility for the project is Transco, and the interconnecting entity is NYISO.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • NYISO queue source as of: Sep 30, 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

NY

County

Columbia

Grid Region

NYISO (New York)

Market

ISO/RTO Member

Developer

KCE NY 38, LLC

Utility

Transco

Entity

NYISO

Service Type

—

Point of Interconnection

Churchtown 115 kV Substation

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
NYISO
Trading Hub
ZONE F
Hub Confidence
HIGH
POI Substation
Churchtown Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.