Blue Spruce Storage (NYISO-C24-005) — Project Summary

Queue ID
NYISO-C24-005
Capacity
300 MW
Technology
Battery
Status
active
Location
Bronx, NY
Region
NYISO
Developer
Blue Spruce Storage LLC
IA Status
—

Blue Spruce Storage

NYISO-C24-005BetaActiveBatteryNYISOLBNL + Live

300 MW storage in Bronx, NY · In queue since August 2024 · Proposed COD August 2028

BA: NYISISO/RTO: NYISONERC: NPCCRC: NYIS

300 MW

Capacity

1

Components

Battery

2y 3m

In Queue

—

IA Status

COD target: 2028

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

4 years

Study Phase

C24

Pre-Study0%
Queue EntryAug 1, 2024

Interconnection request submitted to ISO/RTO

TCS Study

NYISO transitioned to a Transitional Cluster Study (TCS) format in 2024.

Typical: >42 months (historical); ~24 months target

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-08-01

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. Research and queue COD differ; this comparison does not confirm either date. See the queue record for reported project facts.

Research COD
2030
Differs from queue: Aug 1, 2028
Developer in saved assessment
Flatiron Energy
Filed as Blue Spruce Storage LLC
Status at research time
Active
Active in the NYISO queue. Selected by NYSERDA in its first bulk energy storage solicitation (Oct 2026). Pre-construction, with permits still required. NYSERDA's project summary describes 133 MW / 532 MWh in Mott Haven, Bronx, versus 300 MW in LBNL.
Financing
Not recorded

Milestones in this assessment

COD target2030Latest in this assessment

Flatiron plans for Blue Spruce Storage to be operational before the end of 2030, subject to permits and other requirements.

blackridgeresearch.com
Research sources and reasoning (5 recorded sources)

medium confidence at research time

  1. businesswire.com/news/home/20261021957371/en/Flatiron-Energy-Awarded-Contracts-for-Large-Scale-Battery-Storage-Projects-in-New-York-City
  2. blackridgeresearch.com/news-releases/flatiron-energy-secures-contracts-for-two-battery-storage-projects-in-new-york-us?srsltid=AYCX9vJDGkP2Qnrt1Uz8tmspVr-iUM0Qp4zkcmLoOxRmaxM1etYxLEtB
  3. renewablesnow.com/news/flatiron-wins-nyserda-contracts-for-two-new-york-battery-projects-1303433/
  4. nyserda.ny.gov/-/media/Project/Nyserda/Files/Programs/Energy-Storage/Bulk-Storage-Incentives/Blue-Spruce-Storage_Att_B_Public_Project_Summary.pdf
  5. interconnection.fyi/project/nyiso-1557

Commercial operation date: Flatiron's October 2026 announcement of its NYSERDA award says 'Both Blue Spruce Storage and Palladium Storage are planned to be operational before the end of 2030', subject to permits. That is about 2 years later than LBNL's 2028-08-01. Only one underlying announcement (syndicated) supports this, so the year is approximate.

Developer: Business Wire, Renewables Now and EnergyNews all attribute the Blue Spruce Storage NYSERDA bulk storage award to Flatiron Energy. The LBNL filing entity 'Blue Spruce Storage LLC' is the project-specific LLC.

Status: LBNL shows the queue entry as active, and recent coverage shows the project advancing with a state contract and no sign of withdrawal. The interconnection.fyi entry marked withdrawn (NYISO 1557, 245 MW) is a different, older queue number and does not override the active C24-005 entry.

About

Saved background

Generated Apr 10, 2026 · Predates Sep 30, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Blue Spruce Storage is a proposed 300 MW battery storage project located in Bronx County, New York. The project, developed by Blue Spruce Storage LLC, is interconnected to the ConEd utility via the Mott Haven 138KV Bus. It entered the NYISO interconnection queue as project NYISO-C24-005 on August 1, 2024, and has a proposed commercial operation date of August 1, 2028.

The project is currently listed as active in the NYISO queue. Recent news coverage has discussed the development.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • NYISO queue source as of: Sep 30, 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

NY

County

Bronx

Grid Region

NYISO (New York)

Market

ISO/RTO Member

Developer

Blue Spruce Storage LLC

Utility

ConEd

Entity

NYISO

Service Type

—

Point of Interconnection

Mott Haven 138KV Bus

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
NYISO
Trading Hub
ZONE J
Hub Confidence
HIGH
Nearest Node (Estimated)
MOTTHAVN_138_KV_9M4_REV_LBMP_J
POI Substation
Mott Haven Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.