Blue Spruce Storage
300 MW storage in Bronx, NY · In queue since August 2024 · Proposed COD August 2028
300 MW
Capacity
1
Components
Battery
2y 3m
In Queue
—
IA Status
COD target: 2028
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
4 years
Study Phase
C24
Interconnection request submitted to ISO/RTO
NYISO transitioned to a Transitional Cluster Study (TCS) format in 2024.
Typical: >42 months (historical); ~24 months target
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-08-01
Cross-source intelligence
Experimental assessment saved at the research date. Research and queue COD differ; this comparison does not confirm either date. See the queue record for reported project facts.
Milestones in this assessment
Flatiron plans for Blue Spruce Storage to be operational before the end of 2030, subject to permits and other requirements.
blackridgeresearch.comResearch sources and reasoning (5 recorded sources)
medium confidence at research time
- businesswire.com/news/home/20261021957371/en/Flatiron-Energy-Awarded-Contracts-for-Large-Scale-Battery-Storage-Projects-in-New-York-City
- blackridgeresearch.com/news-releases/flatiron-energy-secures-contracts-for-two-battery-storage-projects-in-new-york-us?srsltid=AYCX9vJDGkP2Qnrt1Uz8tmspVr-iUM0Qp4zkcmLoOxRmaxM1etYxLEtB
- renewablesnow.com/news/flatiron-wins-nyserda-contracts-for-two-new-york-battery-projects-1303433/
- nyserda.ny.gov/-/media/Project/Nyserda/Files/Programs/Energy-Storage/Bulk-Storage-Incentives/Blue-Spruce-Storage_Att_B_Public_Project_Summary.pdf
- interconnection.fyi/project/nyiso-1557
Commercial operation date: Flatiron's October 2026 announcement of its NYSERDA award says 'Both Blue Spruce Storage and Palladium Storage are planned to be operational before the end of 2030', subject to permits. That is about 2 years later than LBNL's 2028-08-01. Only one underlying announcement (syndicated) supports this, so the year is approximate.
Developer: Business Wire, Renewables Now and EnergyNews all attribute the Blue Spruce Storage NYSERDA bulk storage award to Flatiron Energy. The LBNL filing entity 'Blue Spruce Storage LLC' is the project-specific LLC.
Status: LBNL shows the queue entry as active, and recent coverage shows the project advancing with a state contract and no sign of withdrawal. The interconnection.fyi entry marked withdrawn (NYISO 1557, 245 MW) is a different, older queue number and does not override the active C24-005 entry.
About
Generated Apr 10, 2026 · Predates Sep 30, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
Blue Spruce Storage is a proposed 300 MW battery storage project located in Bronx County, New York. The project, developed by Blue Spruce Storage LLC, is interconnected to the ConEd utility via the Mott Haven 138KV Bus. It entered the NYISO interconnection queue as project NYISO-C24-005 on August 1, 2024, and has a proposed commercial operation date of August 1, 2028.
The project is currently listed as active in the NYISO queue. Recent news coverage has discussed the development.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- NYISO queue source as of: Sep 30, 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
NY
County
Bronx
Grid Region
NYISO (New York)
Market
ISO/RTO Member
Developer
Blue Spruce Storage LLC
Utility
ConEd
Entity
NYISO
Service Type
—
Point of Interconnection
Mott Haven 138KV Bus
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- NYISO
- Trading Hub
- ZONE J
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- MOTTHAVN_138_KV_9M4_REV_LBMP_J
- POI Substation
- Mott Haven Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
KCE NY 2
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
KCE NY 31
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Nickel Spruce Solar Solar queue pipeline — 1 projects by technology and status
Data-driven briefing on Blue Spruce Storage — fleet, generation, financial, and news signals.
Battery storage queue pipeline
Summary analysis with parallel narrative sections and visualizations.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.