Holtsville 138kV Energy Storage (NYISO-956) — Project Summary

Queue ID
NYISO-956
Capacity
110 MW
Technology
Battery
Status
active
Location
Suffolk, NY
Region
NYISO
Developer
Holtsville Energy Storage, LLC
IA Status
System Impact Study

Holtsville 138kV Energy Storage

NYISO-956BetaActiveBatteryNYISOLBNL + Live

110 MW storage in Suffolk, NY · In queue since December 2019 · Proposed COD September 2026

BA: NYISISO/RTO: NYISONERC: NPCCRC: NYIS

110 MW

Capacity

1

Components

Battery

6y 11m

In Queue

System Impact Study

IA Phase

Signed Jan 2023

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

3y 1m

IA → COD

3y 8m

Total Duration

3y 1m

Schedule

3 months past proposed COD

Construction25%
Queue EntryDec 10, 2019

Interconnection request submitted to ISO/RTO

TCS Study

NYISO transitioned to a Transitional Cluster Study (TCS) format in 2024.

Typical: >42 months (historical); ~24 months target

Interconnection AgreementJan 11, 2023

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Interconnection Queue; status 11

Project under construction

Typical: 6–18 months

Commercial Operation

Proposed COD: 2026-09-01

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Sep 30, 2026 queue source. See the queue record for reported project facts.

Research COD
Sep 2026
From queue filing
Developer in saved assessment
Holtsville Energy Storage, LLC
From queue filing
Status at research time
Active
Active — facing regulatory denial and litigation with Suffolk County Health Services Department over permitting
Financing
Not recorded

Milestones in this assessment

IA executedJan 11, 2023

System Impact Study phase as of IA date

lbnl_queue_snapshot
Permit approvedJan 2026Latest in this assessment

Suffolk County Health Services Department denied permits; developer filed lawsuit

longisland.news12.com
Research sources and reasoning (1 recorded sources)

medium confidence at research time

  1. longisland.news12.com/energy-company-files-lawsuit-over-building-holtsville-battery-energy-storage-system

Commercial operation date: LBNL proposes September 2026 COD. No independent news sources confirm or update this target; project faces regulatory denial that likely delays this timeline.

Developer: Only LBNL filing entity exists. No press releases or news identify a parent operating company; appears to be a project-specific LLC with no disclosed parent.

Status: LBNL shows 'active' queue status. News extraction reveals Suffolk County Health Services Department denied permits, and developer filed lawsuit in response (as of Jan 2026), indicating project is contested but not withdrawn.

About

Saved background

Generated Apr 10, 2026 · Predates Sep 30, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Holtsville 138kV Energy Storage project is a proposed 110 MW battery storage project located in Suffolk County, New York. Developed by Holtsville Energy Storage, LLC, the project is interconnected to the Long Island Power Authority (LIPA) and is in the New York Independent System Operator (NYISO) interconnection queue as queue ID NYISO-956. The project entered the queue on December 10, 2019, and has a proposed commercial operation date of September 1, 2026. Its interconnection status is currently in the System Impact Study phase.

The development project consists of 110 MW of battery storage capacity. The Holtsville 138kV Energy Storage project has been featured in recent industry news.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • NYISO queue source as of: Sep 30, 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

NY

County

Suffolk

Grid Region

NYISO (New York)

Market

ISO/RTO Member

Developer

Holtsville Energy Storage, LLC

Utility

LIPA

Entity

NYISO

Service Type

—

Point of Interconnection

West Bus 138 kV

Data Source

LBNL + Live

ApplicantHoltsville Energy StorageNews12 | Long Island · 2026-01-09
AgencySuffolk County Health Services DepartmentNews12 | Long Island · 2026-01-09
RulingDenialNews12 | Long Island · 2026-01-09
Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
NYISO
Trading Hub
ZONE K
Hub Confidence
HIGH
Nearest Node (Estimated)
NGRID_A4_DSASP

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

Insights & Articles (2)Beta

Last updated 2026-03-26

View all articles