Arthur Kill Energy Storage 1 (NYISO-827) — Project Summary

Queue ID
NYISO-827
Capacity
15 MW
Technology
Battery
Status
active
Location
Richmond, NY
Region
NYISO
Developer
Lighthouse Arthur Kill, LLC
IA Status
Facility Study

Arthur Kill Energy Storage 1

NYISO-827BetaActiveBatteryNYISOLBNL + Live

15 MW storage in Richmond, NY · In queue since April 2019

BA: NYISISO/RTO: NYISONERC: NPCCRC: NYIS

15 MW

Capacity

1

Components

Battery

7y 7m

In Queue

Facility Study

IA Phase

Signed Jul 2022

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

4 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

3y 3m

Total Duration

3y 3m

Construction50%
Queue EntryApr 22, 2019

Interconnection request submitted to ISO/RTO

TCS Study

NYISO transitioned to a Transitional Cluster Study (TCS) format in 2024.

Typical: >42 months (historical); ~24 months target

Interconnection AgreementJul 7, 2022

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Interconnection Queue; status 12

Project under construction

Typical: 6–18 months

Commercial Operation

Commercial operation date not yet determined

About

Saved background

Generated Apr 10, 2026 · Predates Sep 30, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Arthur Kill Energy Storage 1 is a proposed 15 MW battery storage project located in Richmond County, New York. The project, developed by GB Arthur Kill Storage LLC, is interconnected to the NYISO grid under queue ID NYISO-827. It entered the queue on April 22, 2019, and has a proposed commercial operation date of September 1, 2025. The project's interconnection status is currently in the Facility Study phase.

The proposed project is linked to the existing Arthur Kill Energy, LLC operating plant (EIA ID 67880). It will interconnect at the Fresh Kills 13.8kV point of interconnection and connect to ConEd's distribution network. The project has appeared in recent news coverage.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • NYISO queue source as of: Sep 30, 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

NY

County

Richmond

Grid Region

NYISO (New York)

Market

ISO/RTO Member

Developer

Lighthouse Arthur Kill, LLC

Utility

ConEd

Entity

NYISO

Service Type

—

Point of Interconnection

Fresh Kills 13.8kV

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
NYISO
Trading Hub
N.Y.C.
Hub Confidence
MEDIUM
Nearest Node (Estimated)
23512
POI Substation
ARTHUR_KILL_2

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.